# The A66 Northern Trans-Pennine Development Consent Order 2024, Paragraph 1: A 2.8 km length of new and improved A66 trunk road

Extent: E+W

A 2.8 km length of new and improved highway to be classified as part of the A66, commencing from a point 150 metres to the south-west of the existing access to the Livestock Market, and following the existing alignment of the A66 for a distance of 2.4 km to a point 668 metres to the north-east of the new Kemplay Bank Roundabout, and comprising—
(a) a 390 metre length of improved highway commencing from a point 265 metres west of Skirsgill Business Park and following the existing alignment of the A66 for a distance of 390 metres, to a point on the existing A66 carriageway 100 metres south-east of the Livestock Market;
(b) a 600 metre length of improved circulatory carriageway of the M6 J40 roundabout;
(c) a 1.8 km length of improved highway commencing from a point 115 metres south of the North Lakes Hotel & Spa and following the alignment of the existing A66 in a generally westwards direction, passing beneath the bridges at the new Kemplay Bank Roundabout and following the existing alignment of the A66 in a north-easterly direction, then joining the existing A66 carriageway at a point 200 metres north-east of the Police Station,
identified by a red line on the classification of roads plan for scheme 0102.

---
Source: https://www.legislation.gov.uk/uksi/2024/360/schedule/7/paragraph/1 (the official version)