# The A66 Northern Trans-Pennine Development Consent Order 2024, Paragraph 17: A 2.4 kilometre length of new A66 trunk road

Extent: E+W

A 2.4 km length of new road to be constructed and classified (as identified in sub-paragraphs (a) to (d) below) as part of the A66 trunk road
(a) commencing from a point 610 metres to the west of Lane End, then departing from the existing alignment in a south-easterly direction and continuing in a generally easterly direction to a point 370 metres west of Lane End;
(b) passing beneath the new bridge at the Junction at Center Parcs and then continuing in an easterly direction for a distance of 725 metres to a point where it joins the existing A66 carriageway at a point 315 metres east of Lane End;
(c) then departing from the existing A66 alignment in a north easterly direction commencing from a point 315 metres to the east of Lane End in a generally north-easterly direction for a distance of 920 metres; and
(d) continuing eastwards for a distance of 760 metres to a point where it joins the existing A66 carriageway at a point 405 metres to the north-west of the existing westbound junction at Temple Sowerby,
identified by a red line on the classification of roads plan for scheme 03.

---
Source: https://www.legislation.gov.uk/uksi/2024/360/schedule/7/paragraph/17 (the official version)
Page: https://openlegislation.uk/a66-northern-trans-pennine-development-consent-order-2024/schedule-7/paragraph-17
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.