# The A66 Northern Trans-Pennine Development Consent Order 2024, Paragraph 25: Temple Sowerby connector road

Extent: E+W

A 129 metre length of new and existing road to be classified as part of the new A66 commencing at a point 15 metres to the south of its existing junction with the A66 westbound carriageway, continuing in a generally easterly direction, to its junction with the proposed roundabout as shown on sheet 1 of the classification of roads plan for scheme 0405, identified by a red line on the classification of roads plan for scheme 0405.

---