  "url": "https://openlegislation.uk/a66-northern-trans-pennine-development-consent-order-2024/schedule-7/paragraph-88",
  "json_url": "https://openlegislation.uk/a66-northern-trans-pennine-development-consent-order-2024/schedule-7/paragraph-88.json",
  "legislation": "uksi/2024/360",
  "legislation_title": "The A66 Northern Trans-Pennine Development Consent Order 2024",
  "legislation_url": "https://openlegislation.uk/a66-northern-trans-pennine-development-consent-order-2024",
  "path": "schedule/7/paragraph/88",
  "kind": "paragraph",
  "number": "88",
  "heading": "A66 all-purpose dual carriageway",
  "text": "A 6.2 km length of new road to be constructed and classified (as identified in sub-paragraphs (a) to (f) below) as part of the A66 trunk road all-purpose dual carriageway (such length also including existing highway to be improved, as identified in sub-paragraphs (a), (e) and (f) below)—\n(a) commencing from a point 675 metres to the west of the existing junction of the A66 with access to Browson Bank, and following the existing A66 alignment for a distance of 675 metres in a generally easterly direction;\n(b) then departing from the existing alignment of the A66, to run generally parallel with the north side of the existing A66 for a distance of 1.4 km in a generally easterly direction;\n(c) continuing in a generally north-easterly direction, passing under the C12 Collier Lane via a new underbridge 50 metres to the north of the existing junction of the A66 with Collier Lane, then continuing in an easterly direction, to a point 250 metres to the north of the existing A66, at Fox Grove, before curving back in a south-easterly direction;\n(d) continuing in a south-easterly direction through the new Mains Gill Junction, then crossing the existing Moor Lane road at a point 135 metres to the north of the existing junction of the A66 with Moor Lane, and then continuing in a south-easterly direction to cross the existing A66 at a point 328 metres to the east of Mainsgill Bridge;\n(e) then continuing in an easterly-direction and re-joining the existing alignment of the A66, at a point 287 metres to the west of the existing junction of the A66 with the C108 Warrener Lane;\n(f) continuing on the existing alignment of the A66 in an easterly direction for a distance of 1.1 km, to a point 775 metres to the east of the existing junction of the A66 with the C108 Warrener Lane,\nidentified by a red line on the classification of roads plan for scheme 09.",
  "extent": "E+W",
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "I",
      "label": "I1",
      "text": "Sch. 7 para. 88 in force at 28.3.2024, see art. 1"
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2024/360/schedule/7/paragraph/88",
    "retrieved_at": "2026-10-28T21:32:45.630703+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}