# The Abergelli Power Gas Fired Generating Station Order 2019, Article 39: Certification of plans etc.

Extent: E+W+S

(1) The undertaker must, as soon as practicable after the making of this Order, submit to the Secretary of State copies of—
(a) the book of reference;
(b) design principles statement;
(c) the environmental statement, which includes within its appendices the following—
(i) outline construction environment management plan;
(ii) outline landscape and ecological mitigation strategy;
(iii) outline surface water management plan;
(iv) flood consequences assessment;
(v) outline drainage strategy;
(vi) outline construction traffic management plan;
(vii) outline construction staff travel plan;
(viii) outline lighting strategy;
(d) the land plans;
(e) the rights of way, streets and access plan; and
(f) the works plans; and
(g) hedgerow plan,
for certification that they are true copies of the documents referred to in this Order.
(2) A plan or document so certified is to be admissible in any proceedings as evidence of the contents of the document of which it is a copy.

---
Source: https://www.legislation.gov.uk/uksi/2019/1268/article/39 (the official version)
Page: https://openlegislation.uk/abergelli-power-gas-fired-generating-station-order-2019/article-39
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.