# The Abergelli Power Gas Fired Generating Station Order 2019, Paragraph 50: Interpretation

Extent: E+W+S

In this Part of this Schedule—
“apparatus” means any electrical cables, fibre optic cables or other apparatus belonging to or maintained by the solar operator for the purposes of electricity generation and for the export of electricity pursuant to the solar farm permission (including but not limited to all reasonably necessary protective equipment for such electricity generation and export of electricity such as security devices and fencing);
“in” in a context referring to apparatus in land, includes a reference to apparatus under, over or upon land;
“solar farm permission” means full planning permission granted by the City and County of Swansea on 28 May 2013 for the installation of ground mounted array of solar panels, inverter substations and 2.4m fencing on the land at Abergelli Farm, Felindre, Swansea, SA5 7NN (ref 2013/0135);
“solar farm site” means the site on which planning permission was granted by the solar farm permission;
“solar operator” means Abergelli Solar Limited (Company No. 07529596) being the operator of the solar farm on the solar farm site which has consent pursuant to the solar farm permission; and
“specified work” means so much of any of the works comprised in the authorised development or works required to facilitate or which are incidental to the authorised development which are in, on or under any land purchased, leased, held, appropriated or used under this Order that are near to, or will or may affect, any apparatus.

---
Source: https://www.legislation.gov.uk/uksi/2019/1268/schedule/11/paragraph/50 (the official version)