  "url": "https://openlegislation.uk/abergelli-power-gas-fired-generating-station-order-2019/schedule-2/paragraph-2",
  "json_url": "https://openlegislation.uk/abergelli-power-gas-fired-generating-station-order-2019/schedule-2/paragraph-2.json",
  "legislation": "uksi/2019/1268",
  "legislation_title": "The Abergelli Power Gas Fired Generating Station Order 2019",
  "legislation_url": "https://openlegislation.uk/abergelli-power-gas-fired-generating-station-order-2019",
  "path": "schedule/2/paragraph/2",
  "kind": "paragraph",
  "number": "2",
  "heading": "Detailed Design",
  "text": "(1) The authorised development must be carried out in accordance with the approved plans, inclusive of any limits of deviation, bearing the references listed below and any other plans, drawings, documents, details, schemes, statements or strategies which are approved by the relevant planning authority pursuant to any requirement (as the same may be amended by approval of the relevant planning authority pursuant to requirement 29(1))—\nTable 1\nWorks plans\nSubmission document reference number 2.3\nRights of way, streets and access plan\nSubmission document reference number 2.4\n(2) The authorised development must be carried out within the parameters specified in Table 2 and Table 3 (as the same may be amended by approval of the relevant planning authority pursuant to requirement 29(1))—\nTable 2\nBuilding or structure\nMaximum height (metres above 90 metres above ordnance datum)\nMinimum height (metres above 90 metres above ordnance datum)\nMaximum length (metres)\nMaximum width (metres)\nThe gas turbine generator (including gas turbine, generator, air inlet filter house, air inlet duct, exhaust diffuser, and auxiliaries such as lube oil system, air dryers, fuel gas filter package, instrument air system, compressor washing) (Part of numbered work 1A)\n27\n–\n50\n40\nThe exhaust gas emission flue stack (part of numbered work 1A)\n45\n35\n–\n12\nControl room/office/ workshop (part of numbered work 1B)\n7\n–\n45\n25\nEmergency generator (part of numbered work 1B)\n6\n–\n13\n5\nNatural gas receiving station (including compression station, emergency generator, Joule–Thompson boilers and other auxiliary control cabinets) (part of numbered work 1C)\n10\n–\n70\n50\nGatehouse (part of numbered work 1E)\n4.5\n–\n9\n8\nDemineralised water tank (part of numbered work 1B)\n7\n–\n7\n7\nFire water tank (part of numbered work 1B)\n15\n–\n15\n15\nPipeline inspection gauge facility (part of numbered work 1C)\n3\n–\n35\n35\nFin Fan Coolers (part of numbered work 1A)\n10\n28\n14\nTransformer compound (including generator step up transformer, unit and other transformers, connection to underground cable and associated equipment) (part of numbered work 1D)\n15\n–\n65\n60\nTable 3\nStructure\nMaximum width (metres)\nMaximum length (metres)\nMaximum height (metres above 85 metres above ordnance datum)\nMinimum height (metres above 85 metres above ordnance datum)\nMaximum height (metres above the top of the road structure)\nRoad structure over water main, decommissioned oil pipeline (part of numbered work 2)\n12\n60\n5\n1\n–\nSafety barrier (related to the road structure identified above, and part of numbered work 2)\n–\n–\n–\n–\n1.2\n(3) No part of numbered work 5 may commence until details and sections of the proposed site levels for the relevant part of numbered work 5 have been submitted to and approved in writing by the relevant planning authority.\n(4) No part of numbered work 1 may commence until, for the relevant part of numbered work 1, details of the layout, scale and external appearance of the numbered work have been submitted to and approved in writing by the relevant planning authority.\n(5) Work numbered 1 must be designed substantially in accordance with the relevant design principles contained within the design principles statement.\n(6) No part of numbered work 2 which is within 25 metres either side of the centre line of the 66 inch water main may commence until details of the structure for crossing the water main have been submitted to and approved in writing by the relevant planning authority in consultation with Dŵr Cymru Cyfyngedig.",
  "extent": "E+W+S",
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "I",
      "label": "I1",
      "text": "Sch. 2 para. 2 in force at 10.10.2019, see art. 1"
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2019/1268/schedule/2/paragraph/2",
    "retrieved_at": "2026-10-28T22:37:19.066573+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}