# The Able Marine Energy Park Development Consent Order 2014, Paragraph 1

Extent: E+W+S

In this Schedule—
“environmental statement” means the statement submitted under regulation 5(2)(a) of the Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009, together with the shadow Habitats Regulations Assessment report, statements of common ground concluded with Natural England, the MMO and the Environment Agency , any further environmental documents certified by the Secretary of State pursuant article 55A (certification of further environmental documents) and the following documents submitted by the undertaker and certified under article 55 (certification of plans etc)—
Reference
Title
EX 3.1
Able Humber Port Northern Area Planning Committee Meeting Notes Feb 2012
EX 7.7
AMEP Material Management Plan
EX 7.8
Able Marine Energy Park Dredging Strategy
EX 8.5
Validation of 3D Flow and Sediment Models used for Assessment of Impacts of AMEP on Fine Sediment Transport
EX 8.6
Maintenance Dredge Variability
EX 8.7A
Modelling of Final Quay Design (Supplement to Annex 8.1 of the ES)
EX 8.8
Update to Longer Term Morphology Predictions in the Region of the Centrica and E.ON intakes and outfalls
EX 8.9
Historical Review of Morphological Change North of HIT (2001–2010)
EX 8.10
Long-term Morphological Change at Embayment South of Quay
EX 8.11
Water Framework Directive – Compensation Site
EX 8.12
Water Framework Directive – Project Wide
EX 8.12A
Water Framework Directive
EX 8.13
IOTA Dredge Appropriate Assessment
EX 8.14
Hydraulic & Sediment Regime – Piled Structures
EX 8.15
Effect of Moored Vessels on Flows
EX 8.16
Chapter 8 Signposting Document
EX 9.7
Assessment of the effects of relocations of the E.ON and Centrica outfalls on thermal recirculation
EX 10.4
Effect of Dredged Material Disposal on 1) Subtidal and Intertidal Features and 2) Aquatic Ecology
EX 10.5
Supporting Information on Harbour Porpoises in the Humber Estuary
EX 10.6
Impact of Berthing Pocket Construction
EX 10.7
Soft Start and Seals
EX 10.8
Disposal Site Characterisation and Impact Assessment
EX 10.9
Environmental Management and Monitoring Plan: 1. Marine Works (Draft)
EX 11.14
Biotopes of the Intertidal and Subtidal Sediments around the AMEP site, in the Humber Estuary
EX 11.16
Assessment Update for Breeding Birds
EX 11.17
AMEP Vascular Plant Surveys
EX 11.18
Sensitive Months for Birds Using Intertidal
EX 11.19
AMEP Bat Surveys Supplementary Note
EX 11.20
Draft Great Crested Newts Licence Application – acknowledgement of receipt
EX 11.22
The Impact of SPMTs and Cranes on the Operational Buffer
EX 11.23
Immediate Habitat Losses Within the Designated Site
EX 11.24
Medium and Long Term Losses Within the Designated Site
EX 11.26
Pumping Station
EX 11.26A
Water Vole Mitigation
EX 11.27
Killingholme Phase 2 Survey
EX 11.27A
Breeding Bird Mitigation
EX 11.28
Great Crested Newt Survey (2006)
EX 11.29
Water Vole Survey (2009)
EX 11.30
Location of Replacement Ponds for Great Crested Newts
EX 11.31
M456 Invertebrate Survey
EX 11.32
Draft Environmental Monitoring and Management Plan: 2. Terrestrial Habitat – Killingholme
EX 11.33
In combination Effects on Curlew
EX 13.2
Addendum to Flood Risk Assessment
EX 14.4
Simulation Videos and Stills
EX 15.3
A160 Killingholme Humber Port Access, Stage 1 Road Safety Audit
EX 15.4
A160 Killingholme Humber Port Access, Stage 1 Road Safety Audit Designer’s Response
EX 15.5
Additional Junction RSA
EX 19.1
Lighting Lux Plans
EX 20.3
Additional Landscape Masterplan
EX 28.1
Compensation Site Interim Report on Detailed Design
EX 28.2
Old Little Humber Farm: Wet Grassland Creation, Management and Monitoring Plan
EX 28.3
Final Compensation Proposals, Parts 1–10
EX 31.5
Re-Use of In Situ Material at CCS (Inc. Cherry Cobb Sands Phase 2 Site Investigation)
EX 31.5A
Factual Report on Geo–Environmental Ground Investigation, Cherry Cobb Sands
EX 34.2
An Assessment of Temporal Variation of Benthic Invertebrate Communities in the Humber Estuary
EX 35.12
Farmland Disturbance at Cherry Cobb Sands
EX 35.13
Badger Bait–Marking Survey
EX 35.14
Cherry Cobb Sands Compensation Site: Bird Survey Results August 2010 to April 2011
EX 36.2
North Bank Flood Defence Crest Height
EX 36.3
Residual Flood Risk to Property on North Bank
EX 36.4
Embankment Inspection and Maintenance Report
EX 44.1
Supplementary In-Combination Assessment
EX 44.2
Addendum to EX 44.1
; and
“the water framework directive” means Directive 2000/60/EC of the European Parliament and of the Council of 23rd October 2010 establishing a framework for Community action in the field of water policy.

---
Source: https://www.legislation.gov.uk/uksi/2014/2935/schedule/11/paragraph/1 (the official version)
Page: https://openlegislation.uk/able-marine-energy-park-development-consent-order-2014/schedule-11/paragraph-1
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

