# The Able Marine Energy Park Development Consent Order 2014, Paragraph 1

Extent: E+W+S

(1) In this Schedule:—
“the 2009 Act” means the Marine and Coastal Access Act 2009;
“the Centrica outfall” means the area bounded by co-ordinates (53°39.670’N, 00°13.696’W), (53°39.713’N, 00°13.570’W), (53°39.666’N, 00°13.523’W) and (53°39.623’N, 00°13.647’W) and shown on sheet 5 of the works plans;
“clay” means dredged materials with a diameter of less than 31.25 micrometres;
“the E.ON outfall” means the area bounded by co-ordinates (53°39.557’N, 00°13.561’W), (53°39.600’N, 00°13.426’W), (53°39.550’N, 00°13.382’W) and (53°39.508’N, 00°13.517’W) and shown on sheet 5 of the works plans;
“earthworks season” means the period from April to October or such other period set out in British Standard 6031;
“gravel” means dredged materials with a diameter of at least 2 and less than 64 millimetres;
“HU080” means the area bounded by co-ordinates (53°36.30’N, 00°00.62’W), (53°36.47’N, 00°02.32’W), (53°36.95’N, 00°03.47’W) and (53°36.55’N, 00°00.42’W);
“HU082” means the area bounded by co-ordinates (53°37.47’N, 00°02.27’W), (53°37.25’N, 00°00.80’W), (53°36.97’N, 00°00.81’W) and (53°37.12’N, 00°02.29’W);
“licence holder” means the undertaker and any agent or contractor acting on its behalf;
“licensable activity” means an activity licensable under section 66 of the 2009 Act;
“licensed activity” means any activity described in Part 2 of this Schedule;
“marine piles” means piles that will be in a free water condition during construction;
“mean high water springs” means the average of high water heights occurring at the time of spring tides;
“named vessel” means a vessel whose name and type has been notified to the MMO in writing;
“percussive piles” means driven piles but excludes the handling, placing and vibro-driving of piles;
“sand” means dredged materials with a diameter of at least 62.5 micrometres and less than 2 millimetres;
“sea bed” means the ground under the sea; and
“silt” means dredged materials with a diameter of at least 31.25 and less than 62.5 micrometres.
(2) Unless otherwise specified, all geographical co-ordinates given in this Schedule are in latitude and longitude degrees and minutes to two decimal places.
(3) Tonnages of dredged materials are expressed in wet tonnes.

---
Source: https://www.legislation.gov.uk/uksi/2014/2935/schedule/8/paragraph/1 (the official version)
Page: https://openlegislation.uk/able-marine-energy-park-development-consent-order-2014/schedule-8/paragraph-1
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

