# The Able Marine Energy Park Development Consent Order 2014, Paragraph 11

Extent: E+W+S

(1) The licence holder is permitted to carry out capital dredging at the following locations—
(a) the area within the quay limits to a depth of -6.5 metres Chart Datum;
(b) the berthing pocket to a depth of -14.5 metres Chart Datum;
(c) the approach channel to a depth of -9 metres Chart Datum;
(d) the turning area to a depth of -9 metres Chart Datum;
(e) the pumping station outfall to a depth of +2.0 metres Chart Datum; and
(f) the Cherry Cobb Sands breach to a depth of +3.0 metres Chart Datum.
(2) The materials must be dredged in the approximate quantities and deposited at the locations according to the following table—
Location
Material
Maximum tonnage per year
Deposit location
Total licensed tonnage
Area within the quay limits
Gravel
50,000
HU080
725,000
Sand
110,000
Silt
390,000
Clay
175,000
HU082
The berthing pocket
Gravel
5,000
HU080
1,835,000
Sand
50,000
Silt
145,000
Clay
535,000
HU082
Clay
1,100,000
The terrestrial area landward of the existing Killingholme Marshes flood defence wall
The approach channel
Gravel
150,000
Within the quay limits
1,650,000
Gravel
150,000
HU080
Sand
600,000
Silt
500,000
Clay
250,000
HU082
The turning area
Gravel
35,000
HU080
250,000
Sand
95,000
Silt
80,000
Clay
40,000
HU082
The pumping station outfall
Sand
500
HU080
8,000
Silt
7,500
The Cherry Cobb Sands breach
Sand
2,000
If the dredged material is suitable, the area within the proposed managed realignment site
10,000
Silt
8,000

---
Source: https://www.legislation.gov.uk/uksi/2014/2935/schedule/8/paragraph/11 (the official version)