{
  "url": "https://openlegislation.uk/acetylene-safety-england-and-wales-and-scotland-regulations-2014/schedule-1/paragraph-5",
  "json_url": "https://openlegislation.uk/acetylene-safety-england-and-wales-and-scotland-regulations-2014/schedule-1/paragraph-5.json",
  "legislation": "uksi/2014/1639",
  "legislation_title": "The Acetylene Safety (England and Wales and Scotland) Regulations 2014",
  "legislation_url": "https://openlegislation.uk/acetylene-safety-england-and-wales-and-scotland-regulations-2014",
  "path": "schedule/1/paragraph/5",
  "kind": "paragraph",
  "number": "5",
  "heading": "Requirements of a system of connected acetylene equipment",
  "text": "A system of connected acetylene equipment may only be used if the internal diameter of the pipework does not exceed the maximum diameter specified in the Table for the respective pressure of the compressed acetylene gas in use.",
  "extent": null,
  "status": null,
  "version": "current",
  "annotations": [],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2014/1639/schedule/1/paragraph/5",
    "retrieved_at": "2026-10-29T00:12:09.079016+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}