# Airdrie-Bathgate Railway and Linked Improvements Act 2007, Paragraph


In the local government areas of North Lanarkshire and West Lothian—
Work No. 25A—A temporary road at Bedlormie Toll, for the duration of the construction of Work No. 25B, commencing in Airdrie Road (A89) at a point 173 metres south-east of the property known as Raiziehill, passing eastwards and terminating at a point in Airdrie Road 521 metres south-east of that property.
Work No. 25B—A road, being a raising of Airdrie Road (A 89), Bedlormie Toll, over the railway (Work No. 1) and the cyclepath (Work No. 2F), commencing in that road at a point 200 metres south-east of the property known as Raiziehill, passing eastwards over the railway (Work No. 1) and the cyclepath (Work No. 2F), and terminating in Airdrie Road (A89) at a point 390 metres east of that property. Work No. 25B includes a bridge over the railway (Work No. 1) and the cyclepath (Work No. 2F).

---
Source: https://www.legislation.gov.uk/asp/2007/19/schedule/1/paragraph/wrapper12 (the official version)
Page: https://openlegislation.uk/airdrie-bathgate-railway-and-linked-improvements-act-2007/schedule-1/paragraph-wrapper12
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.