# Airdrie-Bathgate Railway and Linked Improvements Act 2007, Paragraph


In the local government area of West Lothian—
Work No. 2G—A cyclepath south of the disused Redburn Quarry, commencing by a junction with the existing cyclepath at a point 406 metres south of the junction of an existing track with Main Street (A89), passing southwards, then eastwards and northwards, and terminating by a junction with the existing cyclepath at a point 413 metres south of the junction of that existing track with Main Street.

---
Source: https://www.legislation.gov.uk/asp/2007/19/schedule/1/paragraph/wrapper8 (the official version)
Page: https://openlegislation.uk/airdrie-bathgate-railway-and-linked-improvements-act-2007/schedule-1/paragraph-wrapper8
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

