OpenLegislation

Regulation 4 Pattern approval and initial verification: the EEC signs and marks

Changes not yet applied. Later legislation changes this provision in ways not yet written into the text below:

(1)

The EEC signs and marks referred to in these Regulations are the following signs and marks:—

(a)

The sign of EEC pattern approval set out in paragraph 1 of Schedule 1 to the Measuring Instruments (EEC Requirements) Regulations 1975f1;

(b)

The sign of EEC limited pattern approval set out in paragraph 2 of the said Schedule 1 ; and

(c)

The mark of EEC initial verification set out in the Schedule to these Regulations.

(2)

In these Regulations, references to the United Kingdom version of a sign or mark referred to in paragraph (1) above are references to the sign or mark appropriate, in accordance with the provisions of the said Schedule 1, or the Schedule to these Regulations (as the case may be), for an EEC pattern approval granted in, or an EEC initial verification carried out in, the United Kingdom.

Annotations

Footnotes

f1

(1975 II, p. 4045).