# The Alternative Dispute Resolution for Consumer Disputes (Extension of Time Limits for Legal Proceedings) (Amendment etc.) (EU Exit) Regulations 2020, Introduction: Introductory text


Exiting The European Union
Consumer Protection
Made 20th October 2020
Coming into force in accordance with regulation 1(2)
The Secretary of State makes these Regulations in exercise of the powers conferred by section 8(1) of, and paragraph 21 of Schedule 7 to, the European Union (Withdrawal) Act 2018.
In accordance with paragraph 1(3) of Schedule 7 to that Act, a draft of this instrument has been laid before Parliament and approved by a resolution of each House of Parliament.

---
Source: https://www.legislation.gov.uk/uksi/2020/1139/introduction (the official version)
Page: https://openlegislation.uk/alternative-dispute-resolution-for-consumer-disputes-extension-of-time-limits-for-legal-proceedings-amendment-etc-eu-exit-regulations-2020/introduction
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

