# The Ashton Vale to Temple Meads and Bristol City Centre Rapid Transit Order 2013, Paragraph 21

Extent: E+W+S

In relation to a work which is a specified work because of its proximity to or effect on a sewer, the plans to be submitted to the specified undertaker under paragraph 20 must be detailed plans describing—
(a) the exact position of the specified work;
(b) the level at which it is proposed to be constructed or renewed;
(c) the manner of its construction or renewal;
(d) the position of all sewers within 15 metres of the specified work or upon which the specified work will impose a load; and
(e) by way of detailed drawings, every alteration proposed to be made to any such sewer.

---
Source: https://www.legislation.gov.uk/uksi/2013/3244/schedule/10/paragraph/21 (the official version)
Page: https://openlegislation.uk/ashton-vale-to-temple-meads-and-bristol-city-centre-rapid-transit-order-2013/schedule-10/paragraph-21
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

