# The Ashton Vale to Temple Meads and Bristol City Centre Rapid Transit Order 2013, Paragraph 35

Extent: E+W+S

For the purposes of paragraph 34—
(a) an extension of apparatus to a length greater than the length of existing apparatus must not be treated as a placing of apparatus of greater dimensions than those of the existing apparatus except in a case where the apparatus as so extended serves a purpose (either additional to or instead of that served by the existing apparatus) which was not served by the existing apparatus; and
(b) where the provision of a joint in a pipe or cable is agreed, or is determined to be necessary, the consequential provision of a jointing chamber or of a manhole is to be treated as if it also had been agreed or had been so determined.

---
Source: https://www.legislation.gov.uk/uksi/2013/3244/schedule/10/paragraph/35 (the official version)
Page: https://openlegislation.uk/ashton-vale-to-temple-meads-and-bristol-city-centre-rapid-transit-order-2013/schedule-10/paragraph-35
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

