# The Associated British Ports (Hull) Harbour Revision Order 2006, Article 4: Power to make works


(1) A.B. Ports may, in the lines and situations shown on the deposited plan and according to the levels shown on the deposited sections, make and maintain the following works partly in the City of Kingston upon Hull and partly on the bed and foreshore of the river Humber—
Work No. 1
A reclamation of the bed of the river Humber comprising an area of 7.5 hectares enclosed by a solid wall commencing at the river wall 575 metres west of the western side of the entrance to the Alexandra Dock, then extending southwards for a distance of 141 metres, turning eastwards for a distance of 411 metres, turning in a north north-easterly direction for a distance of 225 metres and terminating at the western side of the entrance to Alexandra Dock.
(2) A.B. Ports may, within the limits of deviation, from time to time alter, enlarge, replace, relay, extend or reconstruct temporarily or permanently the works.
(3) The works shall for all purposes form part of the undertaking.

---
Source: https://www.legislation.gov.uk/uksi/2006/1135/article/4 (the official version)
Page: https://openlegislation.uk/associated-british-ports-hull-harbour-revision-order-2006/article-4
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

