# The Associated British Ports (Immingham Eastern Ro-Ro Terminal) Development Consent Order 2024, Schedule 7: PLANS AND DOCUMENTS TO BE CERTIFIED

Extent: E+W

(1)
Document
(2)
Document Reference
the book of reference
Document Reference 4.1 v2
the drainage plan
Document Reference 2.7
the engineering sections, drawings and plans
Document Reference 2.6 v4
the Enhanced Operational Controls
Document Reference 10.2.109
the environmental statement
The environmental statement chapters (Document Reference 8.2), figures (Document Reference 8.3), appendices (Document Reference 8.4) subject to the substitutions set out below:
(a)volume 1, chapter 2: proposed development document reference 8.2.2 v2;
(b)volume 1, chapter 3: details of project construction and operation 8.2.3 v2;
(c)volume 1, chapter 6: impact assessment approach document reference 8.2.6 v2;
(d)volume 1, chapter 20: cumulative and in-combination effects document reference 8.2.20 v2;
(e) volume 2, figure 1.2: Layout of Proposed Marine Works at Immingham Eastern Ro-Ro Terminal document reference 10.3.8, Figure 2.3;
(f) volume 2, figure 1.3: Layout of Proposed Landside Works at Immingham Eastern Ro-Ro Terminal document reference 10.3.8, Figure 2.2;
(g) volume 2, Figure 3.1: Demolition Works Associated with Immingham Eastern Ro-Ro Terminal document reference 10.3.8, Figure 3.1;
(h) volume 2, Figure 7.8: Peak Flood Baseline Flows (Top) and Impact of Scheme (Bottom) document reference 10.3.8, Figure 7.1;
(i) volume 2, Figure 7.9: Peak Ebb Baseline Flows (Top) and Impact of Scheme (Bottom) document reference 10.3.8, Figure 7.2;
(j) volume 2, Figure 7.19: Modelled Bed Level Change Over a Mean Spring Neap Cycle document reference 10.3.8, Figure 7.3;
(k) volume 2, Figure 7.20: Predicted Change to BSS on Flood (Top) and Ebb (Bottom) document reference 10.3.8, Figure 7.4;
(l) volume 2, Figure 7.22: Baseline Hs (Top) and Effect of Scheme (Bottom) for 0.5-yr Wave Event from NE (Left) and E (Right) document reference 10.3.8, Figure 7.5;
(m) volume 2, Figure 7.23: Baseline Hs (Top) and Effect of Scheme (Bottom) for 0.5-yr Wave Event from SE (Left) and NE (Right) document reference 10.3.8, Figure 7.6;
(n) volume 2, Figure 7.24: Baseline Hs (Top) and Effect of Scheme (Bottom) for 50-yr Wave Event from E (Left) and SE (Right) document reference 10.3.8, Figure 7.7;
(o) volume 2, figure 8.3.20: location of projects, developments and activities that are scoped into the inter-project effects assessment document reference 8.3.20 v2;
(p) volume 2, Figure 13.1b: Air Quality Study Area document reference 10.3.8, Figure 13.1;
(q) volume 2, Figure 13.3a: Operational Phase Assessment document reference 10.3.8, Figure 13.2;
(r) Volume 2, Figure 14.1: Sound Monitoring Locations document reference 10.3.8, Figure 14.1;
(s) Volume 3, Appendix 2.2: Concept Lighting Design Stage Summary Report reference 10.3.8, Annex A;
(t) Volume 3, Appendix 2.3: Building Schedule reference 10.3.8, Annex B;
(u) volume 3, appendix 10.1: navigational risk assessment document reference 8.4.10(a) v2;
(v) volume 3, appendix 10.2: navigation simulation study – part 1 document reference 8.4.10(b) v2;
(w) volume 3, appendix 10.2: navigation simulation study – part 2 document reference 8.4.10(b) v2;
(x) volume 3, appendix 10.3: navigational simulation – stakeholder demonstrations document reference 8.4.10(c) v2;
(y) Volume 3, Appendix 14.2: Construction Noise Levels and Assumptions reference 10.3.8, Annex C
(z) volume 3, appendix 17.1: transport assessment document reference 8.4.17(a) v2; and
(aa) volume 3, transport assessment addendum document reference 8.4.17(a).1.
the environmental statement addendum
Document Reference 10.3.8
the flood risk assessment
Document Reference 8.4.11
the general arrangement plans
Document Reference 2.5 v2
the land plans
Document Reference 2.2 v2
the lighting plan
Document Reference 2.8 v2
the operational freight management plan
Document Reference 10.2.76 v2
the outline offshore construction environmental management plan
Document Reference 9.2.2 v2
the outline onshore construction environmental management plan
Document Reference 9.2.1 v2
the supplementary navigation information report with appendices
Document Reference 10.2.72
the travel plan
Document Reference 8.4.17(b)
the WEMP
Document Reference 9.4
the works plans
Document Reference 2.3 v2

---
Source: https://www.legislation.gov.uk/uksi/2024/1014/schedule/7 (the official version)