# The Associated British Ports (Immingham Gas Jetty) Harbour Revision Order 2007, Article 4: Power to make works


(1) Subject to the provisions of this Order, A.B. Ports may, in the lines and situations shown on the deposited plan and within the limits of deviation and according to the levels shown on the deposited sections, make and maintain the following works on the bed of the river Humber—
Work No. 1 A new jetty of open pile construction between reference points 518584 418194, 518597 418203, 518612 418152 and 518625 418161;
Work No. 2 A new dolphin at reference point 518543 418201 and connecting walkways between the said new dolphin, the new jetty (Work No. 1) and the existing dolphin at reference point 518575 418155;
Work No. 3 A new structure for pipe support, including a walkway for maintenance purposes, between the new jetty (Work No. 1) at reference point 518985 418173 and the existing gas jetty at reference point 518693 418028 running alongside the new walkway comprised in Work No. 2 and the existing walkway and jetty head comprised in the existing gas jetty.
(2) A.B. Ports may, within the limits of deviation, from time to time alter, enlarge, replace, relay, extend or reconstruct temporarily or permanently the works.
(3) The works shall for all purposes form part of the undertaking.

---
Source: https://www.legislation.gov.uk/uksi/2007/1803/article/4 (the official version)
Page: https://openlegislation.uk/associated-british-ports-immingham-gas-jetty-harbour-revision-order-2007/article-4
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

