# The Associated British Ports (Immingham Green Energy Terminal) Order 2025, Paragraph 11

Extent: E+W+S

In connection with such Work Nos. 1 to 10 and to the extent that they do not otherwise form part of any such work, further associated development within the Order limits comprising such other works as may be necessary or expedient for the purposes of or in connection with the relevant part of the authorised project which do not give rise to any materially new or materially different significant effects from those assessed in the environmental statement or in any environmental information supplied under the 2017 Regulations including—
(a) site preparation works including site clearance and set up (including fencing) and earthworks (including soil stripping and storage, ground preparation and site levelling, lowering and raising);
(b) temporary site construction compounds including (in each case temporary) fencing, storage areas (including for waste and spoil), welfare facilities, buildings, lighting infrastructure, access, parking and drainage infrastructure;
(c) the installation, removal or alteration of the position of services and apparatus including overhead cables and lines and above ground or below ground pipes, pipelines, sewers, watercourses, drains and cables and other conducting media and any pipe sleeves, ducts and culverts in which any apparatus is lodged;
(d) landscaping and other works to mitigate any adverse effects of the construction, maintenance, operation or decommissioning of the authorised project;
(e) works for the benefit or protection of land affected by the authorised project;
(f) works required for the strengthening, improvement, maintenance or reconstruction of any streets;
(g) works required for the protection, strengthening, improvement or maintenance of any buildings;
(h) street works, works to alter the layout of streets, the installation, alteration or removal of street furniture and the marking and lining of any street;
(i) the provision, strengthening, improvement, alteration, diversion and creation of ramps, means of access, footpaths, bridleways and cycleways;
(j) closed circuit television; and
(k) such other works, including works of demolition, as may be necessary for the purposes of or in connection with the construction, operation, maintenance and decommissioning of the authorised project.

---
Source: https://www.legislation.gov.uk/uksi/2025/165/schedule/1/paragraph/11 (the official version)
Page: https://openlegislation.uk/associated-british-ports-immingham-green-energy-terminal-order-2025/schedule-1/paragraph-11
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.