# The Associated British Ports (Immingham Green Energy Terminal) Order 2025, Paragraph 5: Work No. 5

Extent: E+W+S

Within the area shown on sheets 3, 4 and 5 of the works plans as Work No. 5, a hydrogen production facility and associated buildings, plant and infrastructure including—
(a) Work No. 5a, within the area of land shown as such, being up to three hydrogen production units each including fired heater, fired heater flue gas stack, flare stack, heat exchangers, compressor buildings, associated structures, process equipment, pipe-racks, pipelines, pipes, cable-racks, cables and other conducting media;
(b) piling and foundations;
(c) process control building, power distribution buildings, process instrumentation buildings and analyser shelters;
(d) process and utility equipment some of which may be within enclosed shelters including, instrument air compressor equipment, instrument air drier equipment, instrument air drier receiver equipment, emergency generator and fuel storage, fire water tank, fire water pump equipment, chemical dosing equipment and associated equipment;
(e) pipe-racks and cable-racks and above and below ground pipelines, pipes, cables, ducts and other conducting media between works within this Work No. 5 and those comprised in Work Nos. 2 and 4;
(f) road access from the highway at two locations on Laporte Road;
(g) road access at one location from the unnamed private access road off Queens Road;
(h) internal site roads, hard standing and parking areas;
(i) drainage system, associated sumps and pumps and a water retention pond;
(j) utilities, transformers and lighting infrastructure; and
(k) fencing and gates.

---
Source: https://www.legislation.gov.uk/uksi/2025/165/schedule/1/paragraph/5 (the official version)
Page: https://openlegislation.uk/associated-british-ports-immingham-green-energy-terminal-order-2025/schedule-1/paragraph-5
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.