{
  "url": "https://openlegislation.uk/associated-british-ports-immingham-green-energy-terminal-order-2025/schedule-1/paragraph-7/enacted",
  "json_url": "https://openlegislation.uk/associated-british-ports-immingham-green-energy-terminal-order-2025/schedule-1/paragraph-7/enacted.json",
  "legislation": "uksi/2025/165",
  "legislation_title": "The Associated British Ports (Immingham Green Energy Terminal) Order 2025",
  "legislation_url": "https://openlegislation.uk/associated-british-ports-immingham-green-energy-terminal-order-2025/enacted",
  "path": "schedule/1/paragraph/7",
  "kind": "paragraph",
  "number": "7",
  "heading": "Work No. 7",
  "text": "Within the area shown on sheets 5, 6 and 7 of the works plans as Work No. 7, a hydrogen production, storage and distribution facility and associated buildings, plant and infrastructure, including—\n(a) Work No. 7a, within the area shown as such, comprising—\n(i) up to two hydrogen production units each including fired heater, fired heater flue gas stack, heat exchangers, compressor buildings, flare stack, associated structures, process equipment, pipe-racks, pipelines, pipes, cable-racks, cables and other conducting media; and\n(ii) one hydrogen liquefier unit including a cold box with heat exchangers and expanders, compressor buildings, flare stack, associated structures, process equipment, pipe-racks, pipelines, pipes, cable-racks, cables and other conducting media;\n(b) Work No. 7b, within the area shown as such, comprising—\n(i) one hydrogen production unit, including fired heater, fired heater flue gas stack, heat exchangers, compressor buildings, flare stack, associated structures, process equipment, pipe-racks, pipelines, pipes, cable-racks, cables and other conducting media; and\n(ii) up to three hydrogen liquefier units, each including a cold box with heat exchangers and expanders, compressor buildings, flare stack, associated structures, process equipment, pipe-racks, pipelines, pipes, cable-racks, cables and other conducting media;\n(c) Work No. 7c, within the area shown as such, comprising hydrogen storage tanks, hydrogen trailer filling stations, pipe-racks, pipelines, pipes, cable-racks, cables and other conducting media, a hydrogen vent stack and associated process equipment;\n(d) Work No. 7d, within the area of land shown as such, comprising hydrogen vehicle refuelling and trailer filling stations, hydrogen compressors, pipe-racks, pipelines, pipes, cable-racks, cables and other conducting media and associated process equipment;\n(e) piling and foundations;\n(f) control room and workshop building, security and visitor building, contractor building, warehouse, driver administration building, safe haven building, electrical substation and metering station, power distribution buildings, process instrumentation buildings, analyser buildings, temporary vehicle and contractor maintenance buildings;\n(g) other associated buildings not exceeding 6 metres in height (and, for the purposes of this sub-paragraph (g), the expression “buildings” does not include structures, erections or equipment or any part of structures, erections or equipment);\n(h) process and utility equipment some of which may be within enclosed shelters including cooling towers and pumps, instrument air compressor equipment, instrument air drier equipment, instrument air drier receiver equipment, nitrogen generation equipment, steam generation equipment, wastewater and water treatment equipment, emergency generator and fuel storage, fire water tank and firewater pump equipment, chemical dosing equipment and associated equipment;\n(i) pipe-racks and cable-racks and above and below ground pipelines, pipes, cables and other conducting media between works within this Work No. 7 and those within Work No. 6;\n(j) road access from the highway to the site at two locations from Kings Road and two locations from the A1173;\n(k) internal site roads, hard standing and parking areas;\n(l) drainage system, associated sumps and pumps and a water retention pond;\n(m) utilities, transformers and lighting infrastructure; and\n(n) fencing and gates.",
  "extent": "E+W+S",
  "status": null,
  "version": "enacted",
  "annotations": [
    {
      "type": "I",
      "label": "I1",
      "text": "Sch. 1 para. 7 in force at 27.2.2025, see art. 1"
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2025/165/schedule/1/paragraph/7",
    "retrieved_at": "2026-10-28T21:20:25.915436+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}