{
  "url": "https://openlegislation.uk/associated-british-ports-immingham-green-energy-terminal-order-2025/schedule-2/paragraph-1",
  "json_url": "https://openlegislation.uk/associated-british-ports-immingham-green-energy-terminal-order-2025/schedule-2/paragraph-1.json",
  "legislation": "uksi/2025/165",
  "legislation_title": "The Associated British Ports (Immingham Green Energy Terminal) Order 2025",
  "legislation_url": "https://openlegislation.uk/associated-british-ports-immingham-green-energy-terminal-order-2025",
  "path": "schedule/2/paragraph/1",
  "kind": "paragraph",
  "number": "1",
  "heading": "Interpretation",
  "text": "In this Schedule—\n“commence” means beginning to carry out any material operation (as defined in section 155 (when development begins) of the 2008 Act) forming part of the authorised project or the relevant part of it (in each case as specified where the term “commence” is used in this Schedule) other than operations consisting of—\n(a)site clearance (excluding the clearance of trees or other vegetation from Long Strip);\n(b)demolition work;\n(c)environmental surveys and monitoring;\n(d)investigations for the purposes of assessing ground and geological conditions;\n(e)the receipt and erection of construction plant and equipment (excluding in relation to Work No. 9);\n(f)the erection of temporary contractor and site welfare facilities (excluding in relation to Work No. 9);\n(g)the diversion, laying and connection of services;\n(h)the erection of any temporary means of enclosure, the temporary display of site notices or advertisements,\nand “commenced” and “commencement” are to be construed accordingly;\n“decommissioning” means the decommissioning of the relevant part of the authorised project when it is no longer required for operational use or, as the case may be, upon the permanent cessation of operational use (such that it is the undertaker’s understanding and expectation that the relevant part will not be returned to operational use at some point in the future);\n“hydrogen production facility building design code” means the document of that name identified in the table at Schedule 15 (documents and plans to be certified) and which has been certified by the Secretary of State as the hydrogen production facility building design code for the purposes of this Order;\n“outline construction environmental management plan” means the document of that name identified in the table at Schedule 15 (documents and plans to be certified) and which has been certified by the Secretary of State as the outline construction environmental management plan for the purposes of this Order;\n“outline construction traffic management plan” means the document of that name identified in the table at Schedule 15 (documents and plans to be certified) and which has been certified by the Secretary of State as the outline construction traffic management plan for the purposes of this Order;\n“outline decommissioning environmental management plan” means the document of that name identified in the table at Schedule 15 (documents and plans to be certified) and which has been certified by the Secretary of State as the outline decommissioning environmental management plan for the purposes of this Order;\n“outline landscape and ecology management plan” means the document of that name identified in the table at Schedule 15 (documents and plans to be certified) and which has been certified by the Secretary of State as the outline landscape and ecology management plan for the purposes of this Order;\n“outline operational travel plan” means the document of that name identified in the table at Schedule 15 (documents and plans to be certified) and which has been certified by the Secretary of State as the outline operational travel plan for the purposes of this Order;\n“woodland compensation plan” means the document of that name identified in the table at Schedule 15 (documents and plans to be certified) and which has been certified by the Secretary of State as the woodland compensation plan for the purposes of this Order.",
  "extent": "E+W+S",
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "F",
      "label": "F1",
      "text": "Word in Sch. 2 para. 1 substituted (2.7.2025) by The Associated British Ports (Immingham Green Energy Terminal) (Corrections) Order 2025 (S.I. 2025/781), art. 1, Sch. Table"
    },
    {
      "type": "F",
      "label": "F2",
      "text": "Words in Sch. 2 para. 1 substituted (2.7.2025) by The Associated British Ports (Immingham Green Energy Terminal) (Corrections) Order 2025 (S.I. 2025/781), art. 1, Sch. Table"
    },
    {
      "type": "I",
      "label": "I1",
      "text": "Sch. 2 para. 1 in force at 27.2.2025, see art. 1"
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2025/165/schedule/2/paragraph/1",
    "retrieved_at": "2026-10-28T21:20:25.915436+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}