(1) Subject to paragraph 5, the undertaker is permitted to undertake a capital dredge to a depth of 14.5 metres below chart datum (with an allowance for the tolerances of the dredging equipment) of the berth pocket, the grid coordinates for which are specified in paragraph 5(2).
(2) The materials dredged may not exceed the approximate quantities and must be deposited at the locations set out in the following table—
Material
Volume (m3)
Specific gravity
Maximum tonnage (wet tonnes)
Disposal site
Unconsolidated
3,900
1.35
5,265
HU060
Consolidated
100
2.26
226
HU056
(3) It is acknowledged that pursuant to section 75 of the 2009 Act the undertaker does not need a marine licence to carry out maintenance dredging within the statutory harbour authority area of the Port of Immingham and that the disposal of dredged arisings for such maintenance dredging is permitted in accordance with the existing marine licence.
(4) Arisings of consolidated and unconsolidated materials from the capital dredge must be deposited at HU056 or HU060.
(5) It is noted that arisings of unconsolidated materials from maintenance dredging must be deposited at HU060 in accordance with the existing marine licence.

---
Source: https://www.legislation.gov.uk/uksi/2025/165/schedule/3/paragraph/4 (the official version)
Page: https://openlegislation.uk/associated-british-ports-immingham-green-energy-terminal-order-2025/schedule-3/paragraph-4
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.