# The Ayr Road Route (M77) (Speed Limit) Regulations 1996, Paragraph 2


That length of the special road comprising the connecting road which extends from its junction with the main southbound carriageway of the special road to a point 70 metres east of the extended east kerbline of Dumbreck Road, measured along the most northerly kerbline of the connecting road, a distance of 440 metres or thereby.

---
Source: https://www.legislation.gov.uk/uksi/1996/2863/schedule/2/paragraph/2 (the official version)
Page: https://openlegislation.uk/ayr-road-route-m77-speed-limit-regulations-1996/schedule-2/paragraph-2
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

