OpenLegislation

Schedule AREAS AND SPECIFIED PERIODS IN RESPECT OF WHICH PROHIBITION OF FISHING FOR BASS APPLIES

Changes not yet applied. Later legislation changes this provision in ways not yet written into the text below:

Column 1Column 2
Description of AreaPeriod applying in 1990 and subsequent years
Bradwell Power Station
The area between the Baffle Wall and the Bradwell foreshore enclosed by lines drawn perpendicular (145° true) from the NE and SW corners of the Baffle Wall to the shoreBetween 30 April and 1 November
Grain Power Station
The area enclosed by a line drawn 120° true through Grain Martello Tower and Grain Hard Buoy to Garrison Point, and a line drawn 114° true from the foreshore at Grain Power Station to the western extremity of the Ro Ro Terminal, and the Isle of Grain and Sheerness foreshoresAll year
Kingsnorth Power Station
The area enclosed by Bee Ness Jetty and a line drawn 204° true to the tip of Oakham Ness Jetty, thence 260° true to the SE tip of Kingsnorth Jetty, and along the seaward arm of Kingsnorth Jetty and then 298° true to the Kingsnorth power station foreshoreAll year
Chichester Harbour
All tidal waters enclosed by a line drawn 192° true from Eastoke Point to Chichester Bar Beacon, then 078° true to Cakeham TowerBetween 30 April and 1 November
Langstone Harbour
All tidal waters enclosed by a line drawn 153° true from the Gunnery Range Light at Eastney Point to Langstone Fairway Buoy (50° 46.25'N 01° 01.27'W), then 033° true to the foreshore east of Gunner PointBetween 30 April and 1 November
Portsmouth Harbour
All tidal waters enclosed by a line drawn from Gilkicker Point to Southsea CastleBetween 30 April and 1 November
Southampton Water
All tidal waters enclosed by a line drawn 090° true from the Cadland foreshore to the Warsash foreshore passing through the north-west extremity of the Esso tanker jetty but exlcluding those waters above the Redbridge Causeway on the River TestBetween 30 April and 1 November
Fawley Power Station
The area enclosed by a circle drawn with a radius of 3 cables around the outfall from Fawley Power StationBetween 30 April and 1 November
Poole Harbour
All tidal waters enclosed by a line drawn 011° true from Jerry’s Point, through Branksea Castle to Salterns PierBetween 30 April and 1 NovemberThe Fleet
All tidal waters of the Fleet inside Ferry BridgeAll year
River Exe, Devon
All tidal waters enclosed by a line drawn 068° true from Langstone Point to Orcombe PointBetween 30 April and 1 November
River Teign
All tidal waters enclosed by a line drawn 000° true from the Ness to the southernmost leading lightBetween 30 April and 1 November
River Dart, Devon
All tidal waters enclosed by a line drawn 064° true from Combe Point to Inner Froward PointBetween 30 April and 1 January
Salcombe Harbour
All tidal waters enclosed by a line drawn 090° true from Splat Point to Limebury PointBetween 30 April and 1 January
River Avon, Devon
All tidal waters enclosed by a line drawn 206° true from Warren Point at Bigbury-on-Sea to Burgh Island, and a line drawn 090° true from the southern tip of Burgh Island to the coastBetween 30 April and 1 January
River Yealm
All tidal waters enclosed by a line drawn 205° true from Season Point to Mouthstone PointBetween 30 April and 1 January
Plymouth Rivers
All tidal waters enclosed by a line drawn from the western end of Mountbatten Pier 268° true to the landing beacon at Wilderness Point in the River TamarAll year
River Fowey
All tidal waters enclosed by a line drawn 270° true from Penleath Point to the opposite shoreBetween 30 April and 1 January
Fal Estuary
All tidal waters enclosed by a line drawn 045° true from Weir Point to Turnaware PointBetween 30 April and 1 January
Percuil River
All tidal waters enclosed by a line drawn 151° true from St Mawes Castle to Carricknath PointBetween 30 April and 1 January
Helford River
All tidal waters enclosed by a line drawn 199° true from Rosemullion Head to Dennis HeadBetween 30 April and 1 January
River Camel
All tidal waters enclosed by a line drawn 116° true from Stepper Point to Trebetherick PointBetween 30 April and 1 December
River Torridge
All tidal waters enclosed by a line drawn 290° true from Zeta Berth to the opposite shoreBetween 30 April and 1 November
River Taw
All tidal waters enclosed by a line drawn 190° true from the western end of Braunton Pill to the site of the former power station at YellandBetween 30 April and 1 November
Aberthaw Power Station
All tidal waters enclosed by a line drawn at a radius of 1 nautical mile from Breaksea PointAll year
Burry Inlet
All tidal waters enclosed by a line drawn 071° true from Whiteford Lighthouse to Llanelli Docks and a line drawn 180° true from Whiteford Lighthouse to the shoreBetween 30 April and 1 November
Taf, Tywi and Gwendraeth Estuary
All tidal waters enclosed by a line drawn 119° true from Ginst Point to Pen Towyn PointBetween 30 April and 1 November
Milford Haven
All tidal waters enclosed by a line drawn from the shore along the eastern side of the Texaco Terminal approach jetty to the southernmost part of the T jetty thence eastwards along the southern edge of the jetty to the extremity as No. 3 berth (51° 41.87'N, 04° 57.58'W) and then 098° true through the Pennar Beacon to the Llanreath foreshore (51° 41.55'N, 04° 57.58'W) and by a line drawn 162° true along the seaward side of the Pembroke to Neyland road bridgeBetween 30 April and 1 November
River Dyfi
All tidal waters enclosed by a line drawn 168° true from Trefeddian Hotel (52° 32.8'N, 04° 03.6'W) to the flag pole at Ynys Las (52° 31.4'N, 04° 03.8'W)Between 30 April and 1 November
River Mawddach
All tidal waters enclosed by a line drawn 226° true from the flagpole at Barmouth (52° 43.1'N, 04° 03.1'W) to the perch at 52° 42.7'N, 04° 03.7'W thence 155° true to the corner of the sea wall at Fairbourne (52° 42.5'N, 04° 03.6'W)Between 30 April and 1 November
Dwyryd/Glaslyn Estuary
All tidal waters enclosed by a line drawn 152° true from the White House (52° 54.4'N, 04° 09.1'W) to Harlech Point (52° 53.7'N, 04° 08.5'W)Between 30 April and 1 November
Conwy Estuary
All tidal waters enclosed by a line drawn 254° true from the two flag staffs at Deganwy Yacht Club (53° 17.9'N, 03° 50.3'W) to Conwy Morfa (53° 17.3'N, 03° 50.9'W)Between 30 April and 1 November
Dee Estuary
All tidal waters enclosed by a line drawn 213° true from Hilbre Point to Mostyn QuayBetween 31 May and 1 October
Heysham Power Station
All tidal waters enclosed by a line drawn 085° true from No. 7 buoy (54° 01.22'N, 002° 56.28'W) to the shore, a line drawn 020° true from No. 7 buoy towards the Dolphin (54° 02.40'N, 02° 55.52'W), and a line drawn 102° true through the leading lights to Heysham HarbourBetween 31 May and 1 October