Paragraph 36 Interface with the Lincolnshire Reservoir Project
Before finalising the detailed design of any part of the authorised development which is within or within 500m of the Lincolnshire Reservoir Land, the undertaker will provide Anglian Water with the opportunity (within a period of at least 42 days) to review and comment on the proposed detailed design of such part of the authorised development, and will consider any comments reasonably made by Anglian Water where this would influence the consenting, design, construction, operation or maintenance of the Lincolnshire Reservoir Project.