# Bell’s Bridge Order Confirmation Act 1995, Paragraph 4: Power to deviate


Subject to the provisions of this Order, in the construction, reconstruction, renewal or alteration of the work Scottish Enterprise may deviate laterally from the lines or situations thereof shown on the deposited plan to the extent of the limits of deviation, and may deviate vertically from the levels shown on the deposited sections to any extent not exceeding three metres upwards and to such extent downwards as may be found necessary or convenient, but in the exercise of any of the powers granted to them by this Order Scottish Enterprise shall at all times provide in the navigation channel an opening span affording for navigation a clear width of not less than 35 metres between protective fenders and having when closed a clear headway above the level of mean high-water springs (1985) of not less than 3.73 metres being a clear headway of 5.93 metres above ordnance datum (Newlyn) throughout such width and shall not reconstruct, renew or alter Bell’s Bridge otherwise than in a line or situation conforming with or parallel to that shown on the deposited plans.

---
Source: https://www.legislation.gov.uk/ukla/1995/4/schedule/paragraph/4n2 (the official version)
Page: https://openlegislation.uk/bells-bridge-order-confirmation-act-1995/schedule/paragraph-4n2
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.