Schedule POINTS OF COMMENCEMENT AND TERMINATION
From a point 145 metres southeast of the junction of Wharton Street with Mount Street on the west bank of the Grand Union Canal.
To a point on the east bank of the Grand Union Canal 166 metres southeast of the junction of Wharton Street with Mount Street.
SPAN:
A single span of 23.00 metres (show distance between abutments).
WIDTH:
29.5 metres (total width measured square); consisting of 14.75 metres wide southeasterly bound highway 3 metres wide light well and 11.75 metres wide northwesterly bound highway.
HEADWAY:
2.6 metres minimum (weir to soffit).
CONSTRUCTION:
Pre–stressed concrete beam and composite deck, reinforced concrete abutments to be faced in brick.
WATERWAY:
Grand Union Canal (a minimum clear navigable waterway of 13.5 metres wide).
All of which details are shown on the following plan which is annexed hereto:
Location Plan and General arrangement of bridge and specification plan number CRD/7253/27.