OpenLegislation

Paragraph 3

Original text. Later amendments are not shown.

Length of Towing path to be divertedThe length of towing path to be temporarily diverted during the construction of the tunnel is a length adjacent to and on the west side of the length of watercourse described in Article 1 above. It extends from point “C”, 593m north of where the A38 Bristol Road crosses the Birmingham and Worcester canal, to point “D”, 408m north of where the A38 Bristol Road crosses the Birmingham and Worcester canal as marked on the attached plan numbered 2555—379 and is shown by black zebra hatching. The towpath will be diverted to the west side of the watercourse shown in outline and marked “Temporary Towpath Diversion” on the attached plan numbered 2555—379.