OpenLegislation

Schedule 1 SCHEDULED WORKS

Original text. Later amendments are not shown.

(1)

Number of Work

(2)

Description of Work

Work No.1A tramway 422 metres in length (double line), commencing on the existing Blackpool Tramway at the existing turnouts to the south of North Pier, before turning east to cross the Promenade (A584) and continuing in an easterly direction through a remodelled Talbot Square. The Work continues in a north-easterly direction running within the carriageway of Talbot Road terminating at the rear of the north-eastern footway flanking the Talbot Road/Dickson Road/Topping Street junction.
Work No.2A tramway 88 metres in length (double line), commencing at the existing turnouts to the north of North Pier, before turning east to cross the Promenade (A584) and continuing in an easterly direction through a remodelled Talbot Square. The Work terminates at its intersection with Work No.1.
Work No.3A tramroad 110 metres in length (double line), commencing at the termination of Work No.1 running north and then north-east through a development site bounded by Queen Street, High Street, Talbot Road and Dickson Road terminating at the proposed tram stop to the southwest of High Street.