# The Borough of Poole (Poole Harbour Opening Bridges) Order 2006, Paragraph 2


In this Schedule—
“accumulation” means any accumulation of silt or other material which constitutes an impediment to navigation;
“the Channel” means the Back Water Channel;
“construction” includes execution, placing and maintenance and “constructed” shall be construed accordingly;
“erosion” means any erosion of the bed or banks of the Channel or other structure of whatever nature; and
“plans” includes arrangements, sections, descriptions, drawings and specifications.

---
Source: https://www.legislation.gov.uk/uksi/2006/2310/schedule/5/paragraph/2 (the official version)
Page: https://openlegislation.uk/borough-of-poole-poole-harbour-opening-bridges-order-2006/schedule-5/paragraph-2
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

