{
  "url": "https://openlegislation.uk/brechfa-forest-west-wind-farm-order-2013/schedule-1/paragraph-8",
  "json_url": "https://openlegislation.uk/brechfa-forest-west-wind-farm-order-2013/schedule-1/paragraph-8.json",
  "legislation": "uksi/2013/586",
  "legislation_title": "The Brechfa Forest West Wind Farm Order 2013",
  "legislation_url": "https://openlegislation.uk/brechfa-forest-west-wind-farm-order-2013",
  "path": "schedule/1/paragraph/8",
  "kind": "paragraph",
  "number": "8",
  "heading": "Construction traffic management plan",
  "text": "(1) No authorised development shall commence until a construction traffic management plan has been submitted to and approved by the relevant planning authority in consultation with the Department for Transport of the Welsh Government. The construction traffic management plan shall include—\n(a) construction vehicle routing plans;\n(b) evidence of trial runs demonstrating the suitability of the route from point of entry onto the highway network to the site for all abnormal indivisible loads;\n(c) site access plans;\n(d) proposals for the management of junctions to and crossings of highways and other public rights of way;\n(e) proposals for the scheduling and timing of movements of delivery vehicles including details of abnormal indivisible loads;\n(f) details of escorts for abnormal indivisible loads;\n(g) proposals for temporary warning signs and banksman and escort details;\n(h) proposals for assessing the existing condition of affected highways;\n(i) details of any temporary or permanent improvements to highways; and\n(j) proposals for the making good of any incidental damage to highways by construction traffic associated with the authorised project including street furniture, structures, drainage features, highway verge and carriageway surfaces.\n(2) The construction traffic management plan shall be implemented as approved.\n(3) Before any wind turbine is removed or replaced a revised construction traffic management plan, dealing with that removal or replacement, shall be submitted to and approved by the relevant planning authority.",
  "extent": "E+W+S",
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "I",
      "label": "I1",
      "text": "Sch. 1 para. 8 in force at 13.3.2013, see art. 1"
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2013/586/schedule/1/paragraph/8",
    "retrieved_at": "2026-10-29T01:01:09.044334+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}