# The Brechfa Forest Wind Farm Connection (Correction) Order 2017

S.I. 2017/343 · made 9 March 2017

This Order corrects errors in the Brechfa Forest Wind Farm Connection Order 2016, which granted development consent under the Planning Act 2008, following a written request from Western Power Distribution (South Wales) Plc under paragraph 1(5)(a) of Schedule 4 to that Act.

Made under: Planning Act 2008

PDFs: Printed copy https://openlegislation.uk/brechfa-forest-wind-farm-connection-correction-order-2017/pdf/uksi_20170343_en.pdf

## Introductory text

Infrastructure Planning
Made 9th March 2017
Coming into force 10th March 2017
The Brechfa Forest Wind Farm Connection Order 2016 (the “Order”), which granted development consent within the meaning of the Planning Act 2008 (“the Act”), contains correctable errors within the meaning of the Act.
In accordance with paragraph 1(5)(a) of Schedule 4 to the Act, the Secretary of State received, before the end of the relevant period referred to in paragraph 1(6)(a) of that Schedule, a written request from Western Power Distribution (South Wales) Plc to correct errors in the Order. In accordance with paragraph 1(7) of that Schedule, the Secretary of State informed Carmarthenshire County Council that the request had been received.
The Secretary of State, in exercise of the powers conferred by paragraphs 1(4) and (8) of Schedule 4 to the Act, makes the following Order:

## 1 Citation and commencement

This Order may be cited as the Brechfa Forest Wind Farm Connection (Correction) Order 2017 and comes into force on 10th March 2017.

## 2 Corrections

The Brechfa Forest Wind Farm Connection Order 2016 is corrected as follows.
(1) In Part 3 of Schedule 2 (Plans), substitute the table with the following—
“Access and rights of way plans
(1) Drawing title
(2) Drawing number
(3) Revision
Access and Rights of Way Plans
Section A Key Plan – 15/WPD/021
B
Access and Rights of Way Plans
Section A Plan Series – 15/WPD/022
B
Access and Rights of Way Plans
Section B Key Plan – 15/WPD/023
A
Access and Rights of Way Plans
Section B Plan Series – 15/WPD/024
A
Access and Rights of Way Plans
Section C Key Plan – 15/WPD/025
A
Access and Rights of Way Plans
Section C Plan Series – 15/WPD/026
A
”
(2) In Part 5 of Schedule 2 (Plans), substitute the table with the following—
“Design drawings
(1)Drawing title
(2)Drawing number
(3)Revision
Key Plan for Design Drawings
15/WPD/100
A
132kV Overhead Line Work No. 1 Profiles
15/WPD/106
B
132kV Overhead Line Work No. 2 Profiles
15/WPD/102
A
132kV Overhead Line Wood Pole Outlines
15/WPD/103
A
Design Drawings 132kV Underground Cables
15/WPD/104
A
”
(3) In Part 7 of Schedule 2 (Plans), substitute the table with the following—
“Heritage designations plans
(1)Drawing title
(2)Drawing number
(3)Revision
Key Plan for Heritage Designations (Section A)
15/WPD/033
B
Key Plan for Heritage Designations (Section B)
15/WPD/035
A
Key Plan for Heritage Designations (Section C)
15/WPD/037
A
Heritage Designations Plan (Section A)
15/WPD/034
B
Heritage Designations Plan (Section B)
15/WPD/036
A
Heritage Designations Plan (Section C)
15/WPD/038
A
”
(4) In Part 8 of Schedule 2 (Plans), substitute the table with the following—
“Land plans
(1)Drawing title
(2)Drawing number
(3)Revision
Land Plans
Section A Key Plan – 15/WPD/009
B
Land Plans
Section A Plan Series – 15/WPD/010
D
Land Plans
Section B Key Plan – 15/WPD/011
A
Land Plans
Section B Plan Series – 15/WPD/012
D
Land Plans
Section C Key Plan – 15/WPD/013
A
Land Plans
Section C Plan Series – 15/WPD/014
C
”
(5) In Part 9 of Schedule 2 (Plans), substitute the table with the following—
“Trees and Hedges with the potential to be affected plans
(1)Drawing title
(2)Drawing number
(3)Revision
Trees and Hedges with the Potential to be Affected Plans
Section A Key Plan – 15/WPD/039
B
Trees and Hedges with the Potential to be Affected Plans
Section A Plan Series – 15/WPD/110
B
Trees and Hedges with the Potential to be Affected Plans
Section B Key Plan – 15/WPD/041
A
Trees and Hedges with the Potential to be Affected Plans
Section B Plan Series – 15/WPD/111
A
Trees and Hedges with the Potential to be Affected Plans
Section C Key Plan – 15/WPD/043
A
Trees and Hedges with the Potential to be Affected Plans
Section C Plan Series – 15/WPD/044
A
”
(6) In Part 10 of Schedule 2 (Plans), substitute the table with the following—
“Works plans
(1)Drawing title
(2)Drawing number
(3)Revision
Works Plans
Section A Key Plan – 15/WPD/015
B
Works Plans
Section A Plan Series – 15/WPD/107
D
Works Plans
Section B Key Plan – 15/WPD/017
A
Works Plans
Section B Plan Series – 15/WPD/109
B
Works Plans
Section C Key Plan – 15/WPD/019
A
Works Plans
Section C Plan Series – 15/WPD/020
B
”
(7) In Requirement 5(4) of Schedule 3 (Requirements), replace “A/WP/PS/7” with “A/WP/PS/1 Sheet 7 of 7”,

## Signature

Signed by the authority of the Secretary of State for Business, Energy and Industrial Strategy
Giles Scott
Head of Energy Infrastructure Planning and Coal Liabilities
Department for Business, Energy and Industrial Strategy
9th March 2017

## Explanatory note

(This note is not part of the Order)
This Order corrects errors in the Brechfa Forest Wind Farm Connection Order 2016, which granted development consent under the Planning Act 2008, following a written request from Western Power Distribution (South Wales) Plc under paragraph 1(5)(a) of Schedule 4 to that Act.

---
Source: https://www.legislation.gov.uk/uksi/2017/343 (the official version)
Page: https://openlegislation.uk/brechfa-forest-wind-farm-connection-correction-order-2017
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.