# The Brechfa Forest Wind Farm Connection (Correction) Order 2017, Article 2: Corrections


The Brechfa Forest Wind Farm Connection Order 2016 is corrected as follows.
(1) In Part 3 of Schedule 2 (Plans), substitute the table with the following—
“Access and rights of way plans
(1) Drawing title
(2) Drawing number
(3) Revision
Access and Rights of Way Plans
Section A Key Plan – 15/WPD/021
B
Access and Rights of Way Plans
Section A Plan Series – 15/WPD/022
B
Access and Rights of Way Plans
Section B Key Plan – 15/WPD/023
A
Access and Rights of Way Plans
Section B Plan Series – 15/WPD/024
A
Access and Rights of Way Plans
Section C Key Plan – 15/WPD/025
A
Access and Rights of Way Plans
Section C Plan Series – 15/WPD/026
A
”
(2) In Part 5 of Schedule 2 (Plans), substitute the table with the following—
“Design drawings
(1)Drawing title
(2)Drawing number
(3)Revision
Key Plan for Design Drawings
15/WPD/100
A
132kV Overhead Line Work No. 1 Profiles
15/WPD/106
B
132kV Overhead Line Work No. 2 Profiles
15/WPD/102
A
132kV Overhead Line Wood Pole Outlines
15/WPD/103
A
Design Drawings 132kV Underground Cables
15/WPD/104
A
”
(3) In Part 7 of Schedule 2 (Plans), substitute the table with the following—
“Heritage designations plans
(1)Drawing title
(2)Drawing number
(3)Revision
Key Plan for Heritage Designations (Section A)
15/WPD/033
B
Key Plan for Heritage Designations (Section B)
15/WPD/035
A
Key Plan for Heritage Designations (Section C)
15/WPD/037
A
Heritage Designations Plan (Section A)
15/WPD/034
B
Heritage Designations Plan (Section B)
15/WPD/036
A
Heritage Designations Plan (Section C)
15/WPD/038
A
”
(4) In Part 8 of Schedule 2 (Plans), substitute the table with the following—
“Land plans
(1)Drawing title
(2)Drawing number
(3)Revision
Land Plans
Section A Key Plan – 15/WPD/009
B
Land Plans
Section A Plan Series – 15/WPD/010
D
Land Plans
Section B Key Plan – 15/WPD/011
A
Land Plans
Section B Plan Series – 15/WPD/012
D
Land Plans
Section C Key Plan – 15/WPD/013
A
Land Plans
Section C Plan Series – 15/WPD/014
C
”
(5) In Part 9 of Schedule 2 (Plans), substitute the table with the following—
“Trees and Hedges with the potential to be affected plans
(1)Drawing title
(2)Drawing number
(3)Revision
Trees and Hedges with the Potential to be Affected Plans
Section A Key Plan – 15/WPD/039
B
Trees and Hedges with the Potential to be Affected Plans
Section A Plan Series – 15/WPD/110
B
Trees and Hedges with the Potential to be Affected Plans
Section B Key Plan – 15/WPD/041
A
Trees and Hedges with the Potential to be Affected Plans
Section B Plan Series – 15/WPD/111
A
Trees and Hedges with the Potential to be Affected Plans
Section C Key Plan – 15/WPD/043
A
Trees and Hedges with the Potential to be Affected Plans
Section C Plan Series – 15/WPD/044
A
”
(6) In Part 10 of Schedule 2 (Plans), substitute the table with the following—
“Works plans
(1)Drawing title
(2)Drawing number
(3)Revision
Works Plans
Section A Key Plan – 15/WPD/015
B
Works Plans
Section A Plan Series – 15/WPD/107
D
Works Plans
Section B Key Plan – 15/WPD/017
A
Works Plans
Section B Plan Series – 15/WPD/109
B
Works Plans
Section C Key Plan – 15/WPD/019
A
Works Plans
Section C Plan Series – 15/WPD/020
B
”
(7) In Requirement 5(4) of Schedule 3 (Requirements), replace “A/WP/PS/7” with “A/WP/PS/1 Sheet 7 of 7”,

---
Source: https://www.legislation.gov.uk/uksi/2017/343/article/2 (the official version)