(1)Drawing title
(2)Drawing number
(3)Revision
Key Plan for Design Drawings
15/WPD/100
A
132kV Overhead Line Work No. 1 Profiles
15/WPD/106
B
132kV Overhead Line Work No. 2 Profiles
15/WPD/102
A
132kV Overhead Line Wood Pole Outlines
15/WPD/103
A
Design Drawings 132kV Underground Cables
15/WPD/104
A

---