# The Bridlington Harbour Revision Order 1996, Article 3: Power to construct works


(1) Subject to the provisions of this Order, the Commissioners may in the situations and lines and within the limits of deviation and according to the levels shown on the deposited plans and sections construct and maintain the works hereafter described, together with all necessary and proper works and conveniences connected with or incidental thereto, that is to say: —
Work No. 1 — Reclamation by infilling of part of the upper section of Bridlington harbour being the part shown enclosed by broken lines on the deposited plans and described thereon as “Limits of Deviation of Work No. 1” and incorporating a culvert to provide for the flow of the waters of the stream known as Gypsey Race through that part.
Work No. 2 — A slipway commencing at the termination of Work No. 1 at a point at TA1842766555, extending for a distance of 55 metres or thereabouts and terminating at a point at TA1848466545.
(2) Map reference points specified in paragraph (1) above are Ordnance Survey National Grid reference points.
(3) The Commissioners may within the limits of deviation alter, replace, relay or reconstruct the works.

---
Source: https://www.legislation.gov.uk/uksi/1996/3040/article/3 (the official version)
Page: https://openlegislation.uk/bridlington-harbour-revision-order-1996/article-3
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.