Paragraph 1
—In this Part of this Schedule—
-
“the designated lands” means any of the lands shown on the deposited plans within the lines marked “Limit of land to be used” and numbered on those plans—
-
2a, 3, 4 and 5a in the district of East Cambridgeshire, parish of Ely;
-
1, 2, 5, 7, 9, 11, 13 and 14 in the borough of Glanford, parish of Brigg;
-
1, 3, 5, 7, 10 and 14 in the borough of Glanford, parish of Scawby; and
-
2a in the district of Bassetlaw, parish of Ranskill; and
-
-
“the relevant works” means—
- (a)
the reconstruction of bridge number 1569, the more south-westerly of the two bridges carrying the railway between Cambridge and Ely over the river Great Ouse;
- (b)
the strengthening of the embankment of the railway between Gainsborough and Grimsby; and
- (c)
the provision of a loop extension on the railway between Doncaster and Retford.
- (a)