# The Buckinghamshire (Borough of Milton Keynes) (Structural Change) Order 1995, Article 9: Electoral areas in Milton Keynes


(1) On 1st May 1996 the existing wards of Milton Keynes shall be abolished and the said area shall be divided into twenty-four wards which shall bear the names set out in column (1) of Schedule 1 to this Order.
(2) The wards shall comprise the areas respectively described in column (2) of Schedule 1 and the number of councillors to be elected for each ward shall be the number specified in respect of the ward in column (3) of that Schedule.

---
Source: https://www.legislation.gov.uk/uksi/1995/1769/article/9 (the official version)
Page: https://openlegislation.uk/buckinghamshire-borough-of-milton-keynes-structural-change-order-1995/article-9
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

