Regulation 3 Amendments relating to energy efficiency requirements
In regulation 2(1) (interpretation), in the definition of “fixed building services”—
omit the “or” after paragraph (b);
after paragraph (b), insert—
“(ba)fixed lifts, escalators or moving walkways in new buildings that are not in an individual dwelling; or”.
Omit regulation 25A (consideration of high-efficiency alternative systems for new buildings) and regulation 25B (nearly zero-energy requirements for new buildings).
In regulation 25D (energy efficiency rating)—
for the heading substitute “Energy use intensity rating”;
for “Energy efficiency ratings” substitute “Energy use intensity ratings”.
In regulation 26C (minimum energy efficiency rating)—
for the heading substitute “Minimum energy use intensity rating”;
for “energy efficiency rating” substitute “energy use intensity rating”.
In regulation 27C (energy efficiency rating calculations)—
for the heading substitute “Minimum energy use intensity rating calculations”;
in paragraphs (2)(a) and (3)(a)(i) and (ii), for “energy efficiency rating” substitute “energy use intensity rating”.
In Schedule 1 (requirements), in Part L (conservation of fuel and power)—
in entry L1—
in the heading, after “power” insert “and the minimisation of greenhouse gas emissions”;
in the words before paragraph (a), after “power” insert “and the minimisation of greenhouse gas emissions”;
after paragraph (b)(i), insert—
“(ai)minimise greenhouse gas emissions;”;
after paragraph (b)(iii), insert—
“(c)for the purposes of this Part—
“greenhouse gas” has the meaning given by section 37(1) of the Environment (Wales) Act 2016f1.”
after entry L2 insert—
“
On-site installation of renewable electricity generation L2A.—(1) When a dwelling or a building containing a dwelling is erected, a system for renewable electricity generation must be installed on-site. Requirement L2A does not apply to— (2) The system installed under sub-paragraph (1) must be— (a) designed to enable any electricity generated by it to be available for the use of residents of the buildings, and (a) a building which is a relevant building within the meaning of regulation 7(4); or (b) capable of generating a reasonable output taking into account the design of the buildings and its surroundings. (b) a building on which it is not possible to install a system for renewable electricity generation capable of generating a reasonable output on account of its design or surroundings. ”
Annotations
Footnotes
- f1