# The Building (Higher-Risk Buildings Procedures) (England) Regulations 2023, Regulation 16: Regulator’s power to require notifications etc for work to existing HRB

Extent: E+W

(1) The regulator may, by notice in writing, require a client—
(a) to notify the regulator, within a specified period, when a specified point of the work to existing HRB has been reached;
(b) not to cover up specified work for a specified period.
(2) In this regulation “specified” means specified by the regulator in the notice referred to in paragraph (1).

---
Source: https://www.legislation.gov.uk/uksi/2023/909/regulation/16 (the official version)
Page: https://openlegislation.uk/building-higher-risk-buildings-procedures-england-regulations-2023/regulation-16
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

