  "url": "https://openlegislation.uk/building-higher-risk-buildings-procedures-wales-regulations-2025",
  "json_url": "https://openlegislation.uk/building-higher-risk-buildings-procedures-wales-regulations-2025.json",
  "id": "wsi/2025/1321",
  "title": "The Building (Higher-Risk Buildings Procedures) (Wales) Regulations 2025",
  "short_title": "Building (Higher-Risk Buildings Procedures) 2025",
  "long_title": "This instrument is part of a number of Regulations which implement the Building Safety Act 2022 in respect of higher-risk buildings in Wales.",
  "citation": "W.S.I. 2025/1321",
  "type": "wsi",
  "year": "2025",
  "number": "1321",
  "version": "current",
  "date": "2025-12-12",
  "revised": true,
  "valid_from": "2026-07-20",
  "extent": "E+W",
  "unapplied_effects": 0,
  "provisions": [
    {
      "path": "introduction",
      "kind": "introduction",
      "number": null,
      "heading": "Introductory text",
      "url": "https://openlegislation.uk/building-higher-risk-buildings-procedures-wales-regulations-2025/introduction",
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "part/1",
      "kind": "part",
      "number": "1",
      "heading": "Preliminary",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "regulation/1",
      "kind": "regulation",
      "number": "1",
      "heading": "Title, application and coming into force",
      "url": "https://openlegislation.uk/building-higher-risk-buildings-procedures-wales-regulations-2025/regulation-1",
      "extent": "E+W",
      "status": null,
      "parent": "part/1"
    },
    {
      "path": "regulation/2",
      "kind": "regulation",
      "number": "2",
      "heading": "Interpretation",
      "url": "https://openlegislation.uk/building-higher-risk-buildings-procedures-wales-regulations-2025/regulation-2",
      "extent": "E+W",
      "status": null,
      "parent": "part/1"
    },
    {
      "path": "part/2",
      "kind": "part",
      "number": "2",
      "heading": "Building Control Approval",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "part/2/chapter/1",
      "kind": "chapter",
      "number": "1",
      "heading": "New HRBs",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": "part/2"
    },
    {
      "path": "regulation/3",
      "kind": "regulation",
      "number": "3",
      "heading": "Building control approval for HRB work or stage of HRB work",
      "url": "https://openlegislation.uk/building-higher-risk-buildings-procedures-wales-regulations-2025/regulation-3",
      "extent": "E+W",
      "status": null,
      "parent": "part/2/chapter/1"
    },
    {
      "path": "regulation/4",
      "kind": "regulation",
      "number": "4",
      "heading": "Building control approval applications for HRB work or stage of HRB work",
      "url": "https://openlegislation.uk/building-higher-risk-buildings-procedures-wales-regulations-2025/regulation-4",
      "extent": "E+W",
      "status": null,
      "parent": "part/2/chapter/1"
    },
    {
      "path": "regulation/5",
      "kind": "regulation",
      "number": "5",
      "heading": "Building control approval applications for HRB work or stage of HRB work: time limit",
      "url": "https://openlegislation.uk/building-higher-risk-buildings-procedures-wales-regulations-2025/regulation-5",
      "extent": "E+W",
      "status": null,
      "parent": "part/2/chapter/1"
    },
    {
      "path": "regulation/6",
      "kind": "regulation",
      "number": "6",
      "heading": "Building control approval applications for HRB work or stage of HRB work: consultation",
      "url": "https://openlegislation.uk/building-higher-risk-buildings-procedures-wales-regulations-2025/regulation-6",
      "extent": "E+W",
      "status": null,
      "parent": "part/2/chapter/1"
    },
    {
      "path": "regulation/7",
      "kind": "regulation",
      "number": "7",
      "heading": "Building control approval applications for HRB work or stage of HRB work: decisions",
      "url": "https://openlegislation.uk/building-higher-risk-buildings-procedures-wales-regulations-2025/regulation-7",
      "extent": "E+W",
      "status": null,
      "parent": "part/2/chapter/1"
    },
    {
      "path": "regulation/8",
      "kind": "regulation",
      "number": "8",
      "heading": "Building control authority’s power to require notifications etc. for HRB work or stage of HRB work",
      "url": "https://openlegislation.uk/building-higher-risk-buildings-procedures-wales-regulations-2025/regulation-8",
      "extent": "E+W",
      "status": null,
      "parent": "part/2/chapter/1"
    },
    {
      "path": "regulation/9",
      "kind": "regulation",
      "number": "9",
      "heading": "Notice before starting on site and further notice when work is “commenced”",
      "url": "https://openlegislation.uk/building-higher-risk-buildings-procedures-wales-regulations-2025/regulation-9",
      "extent": "E+W",
      "status": null,
      "parent": "part/2/chapter/1"
    },
    {
      "path": "part/2/chapter/2",
      "kind": "chapter",
      "number": "2",
      "heading": "Existing HRBs",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": "part/2"
    },
    {
      "path": "regulation/10",
      "kind": "regulation",
      "number": "10",
      "heading": "Notification of emergency repairs to existing HRB",
      "url": "https://openlegislation.uk/building-higher-risk-buildings-procedures-wales-regulations-2025/regulation-10",
      "extent": "E+W",
      "status": null,
      "parent": "part/2/chapter/2"
    },
    {
      "path": "regulation/11",
      "kind": "regulation",
      "number": "11",
      "heading": "Building control approval for work to existing HRB",
      "url": "https://openlegislation.uk/building-higher-risk-buildings-procedures-wales-regulations-2025/regulation-11",
      "extent": "E+W",
      "status": null,
      "parent": "part/2/chapter/2"
    },
    {
      "path": "regulation/12",
      "kind": "regulation",
      "number": "12",
      "heading": "Building control approval applications for work to existing HRB",
      "url": "https://openlegislation.uk/building-higher-risk-buildings-procedures-wales-regulations-2025/regulation-12",
      "extent": "E+W",
      "status": null,
      "parent": "part/2/chapter/2"
    },
    {
      "path": "regulation/13",
      "kind": "regulation",
      "number": "13",
      "heading": "Building control approval applications for work to existing HRB: time limit",
      "url": "https://openlegislation.uk/building-higher-risk-buildings-procedures-wales-regulations-2025/regulation-13",
      "extent": "E+W",
      "status": null,
      "parent": "part/2/chapter/2"
    },
    {
      "path": "regulation/14",
      "kind": "regulation",
      "number": "14",
      "heading": "Building control approval applications for work to existing HRB: consultation",
      "url": "https://openlegislation.uk/building-higher-risk-buildings-procedures-wales-regulations-2025/regulation-14",
      "extent": "E+W",
      "status": null,
      "parent": "part/2/chapter/2"
    },
    {
      "path": "regulation/15",
      "kind": "regulation",
      "number": "15",
      "heading": "Building control approval applications for work to existing HRB: decisions",
      "url": "https://openlegislation.uk/building-higher-risk-buildings-procedures-wales-regulations-2025/regulation-15",
      "extent": "E+W",
      "status": null,
      "parent": "part/2/chapter/2"
    },
    {
      "path": "regulation/16",
      "kind": "regulation",
      "number": "16",
      "heading": "Building control authority’s power to require notifications for work to existing HRB",
      "url": "https://openlegislation.uk/building-higher-risk-buildings-procedures-wales-regulations-2025/regulation-16",
      "extent": "E+W",
      "status": null,
      "parent": "part/2/chapter/2"
    },
    {
      "path": "regulation/17",
      "kind": "regulation",
      "number": "17",
      "heading": "Notice before starting on site and further notice when work is “commenced”",
      "url": "https://openlegislation.uk/building-higher-risk-buildings-procedures-wales-regulations-2025/regulation-17",
      "extent": "E+W",
      "status": null,
      "parent": "part/2/chapter/2"
    },
    {
      "path": "part/3",
      "kind": "part",
      "number": "3",
      "heading": "Changes before or during construction",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "regulation/18",
      "kind": "regulation",
      "number": "18",
      "heading": "Change control",
      "url": "https://openlegislation.uk/building-higher-risk-buildings-procedures-wales-regulations-2025/regulation-18",
      "extent": "E+W",
      "status": null,
      "parent": "part/3"
    },
    {
      "path": "regulation/19",
      "kind": "regulation",
      "number": "19",
      "heading": "Change control: record-keeping",
      "url": "https://openlegislation.uk/building-higher-risk-buildings-procedures-wales-regulations-2025/regulation-19",
      "extent": "E+W",
      "status": null,
      "parent": "part/3"
    },
    {
      "path": "regulation/20",
      "kind": "regulation",
      "number": "20",
      "heading": "Change control: notification requirements",
      "url": "https://openlegislation.uk/building-higher-risk-buildings-procedures-wales-regulations-2025/regulation-20",
      "extent": "E+W",
      "status": null,
      "parent": "part/3"
    },
    {
      "path": "regulation/21",
      "kind": "regulation",
      "number": "21",
      "heading": "Change control applications",
      "url": "https://openlegislation.uk/building-higher-risk-buildings-procedures-wales-regulations-2025/regulation-21",
      "extent": "E+W",
      "status": null,
      "parent": "part/3"
    },
    {
      "path": "regulation/22",
      "kind": "regulation",
      "number": "22",
      "heading": "Change control applications: time limit",
      "url": "https://openlegislation.uk/building-higher-risk-buildings-procedures-wales-regulations-2025/regulation-22",
      "extent": "E+W",
      "status": null,
      "parent": "part/3"
    },
    {
      "path": "regulation/23",
      "kind": "regulation",
      "number": "23",
      "heading": "Change control applications: consultation",
      "url": "https://openlegislation.uk/building-higher-risk-buildings-procedures-wales-regulations-2025/regulation-23",
      "extent": "E+W",
      "status": null,
      "parent": "part/3"
    },
    {
      "path": "regulation/24",
      "kind": "regulation",
      "number": "24",
      "heading": "Change control applications: decisions",
      "url": "https://openlegislation.uk/building-higher-risk-buildings-procedures-wales-regulations-2025/regulation-24",
      "extent": "E+W",
      "status": null,
      "parent": "part/3"
    },
    {
      "path": "regulation/25",
      "kind": "regulation",
      "number": "25",
      "heading": "Change control: the building control authority’s power to specify notifiable changes and major changes",
      "url": "https://openlegislation.uk/building-higher-risk-buildings-procedures-wales-regulations-2025/regulation-25",
      "extent": "E+W",
      "status": null,
      "parent": "part/3"
    },
    {
      "path": "regulation/26",
      "kind": "regulation",
      "number": "26",
      "heading": "Change control: major changes and notifiable changes",
      "url": "https://openlegislation.uk/building-higher-risk-buildings-procedures-wales-regulations-2025/regulation-26",
      "extent": "E+W",
      "status": null,
      "parent": "part/3"
    },
    {
      "path": "regulation/27",
      "kind": "regulation",
      "number": "27",
      "heading": "New client etc.",
      "url": "https://openlegislation.uk/building-higher-risk-buildings-procedures-wales-regulations-2025/regulation-27",
      "extent": "E+W",
      "status": null,
      "parent": "part/3"
    },
    {
      "path": "regulation/28",
      "kind": "regulation",
      "number": "28",
      "heading": "Insolvency etc. of the client: notifications",
      "url": "https://openlegislation.uk/building-higher-risk-buildings-procedures-wales-regulations-2025/regulation-28",
      "extent": "E+W",
      "status": null,
      "parent": "part/3"
    },
    {
      "path": "regulation/29",
      "kind": "regulation",
      "number": "29",
      "heading": "New principal contractor or principal designer etc: notification",
      "url": "https://openlegislation.uk/building-higher-risk-buildings-procedures-wales-regulations-2025/regulation-29",
      "extent": "E+W",
      "status": null,
      "parent": "part/3"
    },
    {
      "path": "regulation/30",
      "kind": "regulation",
      "number": "30",
      "heading": "Variation of a requirement imposed on a building control approval",
      "url": "https://openlegislation.uk/building-higher-risk-buildings-procedures-wales-regulations-2025/regulation-30",
      "extent": "E+W",
      "status": null,
      "parent": "part/3"
    },
    {
      "path": "part/4",
      "kind": "part",
      "number": "4",
      "heading": "Golden thread, mandatory reporting, information handover etc.",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "regulation/31",
      "kind": "regulation",
      "number": "31",
      "heading": "Golden thread",
      "url": "https://openlegislation.uk/building-higher-risk-buildings-procedures-wales-regulations-2025/regulation-31",
      "extent": "E+W",
      "status": null,
      "parent": "part/4"
    },
    {
      "path": "regulation/32",
      "kind": "regulation",
      "number": "32",
      "heading": "Mandatory occurrence reporting system",
      "url": "https://openlegislation.uk/building-higher-risk-buildings-procedures-wales-regulations-2025/regulation-32",
      "extent": "E+W",
      "status": null,
      "parent": "part/4"
    },
    {
      "path": "regulation/33",
      "kind": "regulation",
      "number": "33",
      "heading": "Mandatory occurrence reporting: reporting to the building control authority",
      "url": "https://openlegislation.uk/building-higher-risk-buildings-procedures-wales-regulations-2025/regulation-33",
      "extent": "E+W",
      "status": null,
      "parent": "part/4"
    },
    {
      "path": "regulation/34",
      "kind": "regulation",
      "number": "34",
      "heading": "Mandatory occurrence reporting: defences",
      "url": "https://openlegislation.uk/building-higher-risk-buildings-procedures-wales-regulations-2025/regulation-34",
      "extent": "E+W",
      "status": null,
      "parent": "part/4"
    },
    {
      "path": "regulation/35",
      "kind": "regulation",
      "number": "35",
      "heading": "Mandatory occurrence reporting: definitions",
      "url": "https://openlegislation.uk/building-higher-risk-buildings-procedures-wales-regulations-2025/regulation-35",
      "extent": "E+W",
      "status": null,
      "parent": "part/4"
    },
    {
      "path": "regulation/36",
      "kind": "regulation",
      "number": "36",
      "heading": "Mandatory occurrence reporting: client duty on appointment of principal contractor or principal designer",
      "url": "https://openlegislation.uk/building-higher-risk-buildings-procedures-wales-regulations-2025/regulation-36",
      "extent": "E+W",
      "status": null,
      "parent": "part/4"
    },
    {
      "path": "regulation/37",
      "kind": "regulation",
      "number": "37",
      "heading": "Handover of information on completion etc.",
      "url": "https://openlegislation.uk/building-higher-risk-buildings-procedures-wales-regulations-2025/regulation-37",
      "extent": "E+W",
      "status": null,
      "parent": "part/4"
    },
    {
      "path": "regulation/38",
      "kind": "regulation",
      "number": "38",
      "heading": "Information to be provided where work is scheme work",
      "url": "https://openlegislation.uk/building-higher-risk-buildings-procedures-wales-regulations-2025/regulation-38",
      "extent": "E+W",
      "status": null,
      "parent": "part/4"
    },
    {
      "path": "part/5",
      "kind": "part",
      "number": "5",
      "heading": "Completion certificates",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "regulation/39",
      "kind": "regulation",
      "number": "39",
      "heading": "Completion certificate applications",
      "url": "https://openlegislation.uk/building-higher-risk-buildings-procedures-wales-regulations-2025/regulation-39",
      "extent": "E+W",
      "status": null,
      "parent": "part/5"
    },
    {
      "path": "regulation/40",
      "kind": "regulation",
      "number": "40",
      "heading": "Completion certificate applications: time limit",
      "url": "https://openlegislation.uk/building-higher-risk-buildings-procedures-wales-regulations-2025/regulation-40",
      "extent": "E+W",
      "status": null,
      "parent": "part/5"
    },
    {
      "path": "regulation/41",
      "kind": "regulation",
      "number": "41",
      "heading": "Completion certificate applications: consultation",
      "url": "https://openlegislation.uk/building-higher-risk-buildings-procedures-wales-regulations-2025/regulation-41",
      "extent": "E+W",
      "status": null,
      "parent": "part/5"
    },
    {
      "path": "regulation/42",
      "kind": "regulation",
      "number": "42",
      "heading": "Completion certificate applications: inspection",
      "url": "https://openlegislation.uk/building-higher-risk-buildings-procedures-wales-regulations-2025/regulation-42",
      "extent": "E+W",
      "status": null,
      "parent": "part/5"
    },
    {
      "path": "regulation/43",
      "kind": "regulation",
      "number": "43",
      "heading": "Completion certificate applications: decisions",
      "url": "https://openlegislation.uk/building-higher-risk-buildings-procedures-wales-regulations-2025/regulation-43",
      "extent": "E+W",
      "status": null,
      "parent": "part/5"
    },
    {
      "path": "regulation/44",
      "kind": "regulation",
      "number": "44",
      "heading": "Partial completion certificates",
      "url": "https://openlegislation.uk/building-higher-risk-buildings-procedures-wales-regulations-2025/regulation-44",
      "extent": "E+W",
      "status": null,
      "parent": "part/5"
    },
    {
      "path": "part/6",
      "kind": "part",
      "number": "6",
      "heading": "Inspections etc., regularisation, review of decisions, appeals and section 30A procedures etc.",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "regulation/45",
      "kind": "regulation",
      "number": "45",
      "heading": "Inspections etc.",
      "url": "https://openlegislation.uk/building-higher-risk-buildings-procedures-wales-regulations-2025/regulation-45",
      "extent": "E+W",
      "status": null,
      "parent": "part/6"
    },
    {
      "path": "regulation/46",
      "kind": "regulation",
      "number": "46",
      "heading": "Regularisation of unauthorised building work",
      "url": "https://openlegislation.uk/building-higher-risk-buildings-procedures-wales-regulations-2025/regulation-46",
      "extent": "E+W",
      "status": null,
      "parent": "part/6"
    },
    {
      "path": "regulation/47",
      "kind": "regulation",
      "number": "47",
      "heading": "Appeal of decisions",
      "url": "https://openlegislation.uk/building-higher-risk-buildings-procedures-wales-regulations-2025/regulation-47",
      "extent": "E+W",
      "status": null,
      "parent": "part/6"
    },
    {
      "path": "regulation/48",
      "kind": "regulation",
      "number": "48",
      "heading": "Appeal in relation to Welsh Ministers’ decision",
      "url": "https://openlegislation.uk/building-higher-risk-buildings-procedures-wales-regulations-2025/regulation-48",
      "extent": "E+W",
      "status": null,
      "parent": "part/6"
    },
    {
      "path": "regulation/49",
      "kind": "regulation",
      "number": "49",
      "heading": "Section 30A prescribed applications",
      "url": "https://openlegislation.uk/building-higher-risk-buildings-procedures-wales-regulations-2025/regulation-49",
      "extent": "E+W",
      "status": null,
      "parent": "part/6"
    },
    {
      "path": "regulation/50",
      "kind": "regulation",
      "number": "50",
      "heading": "Section 30A applications: procedure",
      "url": "https://openlegislation.uk/building-higher-risk-buildings-procedures-wales-regulations-2025/regulation-50",
      "extent": "E+W",
      "status": null,
      "parent": "part/6"
    },
    {
      "path": "regulation/51",
      "kind": "regulation",
      "number": "51",
      "heading": "Section 30A applications: electronic submissions",
      "url": "https://openlegislation.uk/building-higher-risk-buildings-procedures-wales-regulations-2025/regulation-51",
      "extent": "E+W",
      "status": null,
      "parent": "part/6"
    },
    {
      "path": "regulation/52",
      "kind": "regulation",
      "number": "52",
      "heading": "Section 30A applications: determinations",
      "url": "https://openlegislation.uk/building-higher-risk-buildings-procedures-wales-regulations-2025/regulation-52",
      "extent": "E+W",
      "status": null,
      "parent": "part/6"
    },
    {
      "path": "regulation/53",
      "kind": "regulation",
      "number": "53",
      "heading": "Section 30A applications: appointed persons",
      "url": "https://openlegislation.uk/building-higher-risk-buildings-procedures-wales-regulations-2025/regulation-53",
      "extent": "E+W",
      "status": null,
      "parent": "part/6"
    },
    {
      "path": "regulation/54",
      "kind": "regulation",
      "number": "54",
      "heading": "Deemed rejection of the original application",
      "url": "https://openlegislation.uk/building-higher-risk-buildings-procedures-wales-regulations-2025/regulation-54",
      "extent": "E+W",
      "status": null,
      "parent": "part/6"
    },
    {
      "path": "regulation/55",
      "kind": "regulation",
      "number": "55",
      "heading": "Section 30A applications: appeals",
      "url": "https://openlegislation.uk/building-higher-risk-buildings-procedures-wales-regulations-2025/regulation-55",
      "extent": "E+W",
      "status": null,
      "parent": "part/6"
    },
    {
      "path": "part/7",
      "kind": "part",
      "number": "7",
      "heading": "Miscellaneous",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "regulation/56",
      "kind": "regulation",
      "number": "56",
      "heading": "Exempt work",
      "url": "https://openlegislation.uk/building-higher-risk-buildings-procedures-wales-regulations-2025/regulation-56",
      "extent": "E+W",
      "status": null,
      "parent": "part/7"
    },
    {
      "path": "regulation/57",
      "kind": "regulation",
      "number": "57",
      "heading": "Contraventions by the building control authority not to be subject to enforcement",
      "url": "https://openlegislation.uk/building-higher-risk-buildings-procedures-wales-regulations-2025/regulation-57",
      "extent": "E+W",
      "status": null,
      "parent": "part/7"
    },
    {
      "path": "regulation/58",
      "kind": "regulation",
      "number": "58",
      "heading": "Provisions in relation to which a stop notice may be given",
      "url": "https://openlegislation.uk/building-higher-risk-buildings-procedures-wales-regulations-2025/regulation-58",
      "extent": "E+W",
      "status": null,
      "parent": "part/7"
    },
    {
      "path": "regulation/59",
      "kind": "regulation",
      "number": "59",
      "heading": "Transitional provisions",
      "url": "https://openlegislation.uk/building-higher-risk-buildings-procedures-wales-regulations-2025/regulation-59",
      "extent": "E+W",
      "status": null,
      "parent": "part/7"
    },
    {
      "path": "signature",
      "kind": "signature",
      "number": null,
      "heading": "Signature",
      "url": "https://openlegislation.uk/building-higher-risk-buildings-procedures-wales-regulations-2025/signature",
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "schedule/1",
      "kind": "schedule",
      "number": "1",
      "heading": "Documents",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "schedule/1/paragraph/1",
      "kind": "paragraph",
      "number": "1",
      "heading": "Competence declaration",
      "url": "https://openlegislation.uk/building-higher-risk-buildings-procedures-wales-regulations-2025/schedule-1/paragraph-1",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/1"
    },
    {
      "path": "schedule/1/paragraph/2",
      "kind": "paragraph",
      "number": "2",
      "heading": "Construction control plan",
      "url": "https://openlegislation.uk/building-higher-risk-buildings-procedures-wales-regulations-2025/schedule-1/paragraph-2",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/1"
    },
    {
      "path": "schedule/1/paragraph/3",
      "kind": "paragraph",
      "number": "3",
      "heading": "Change control plan",
      "url": "https://openlegislation.uk/building-higher-risk-buildings-procedures-wales-regulations-2025/schedule-1/paragraph-3",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/1"
    },
    {
      "path": "schedule/1/paragraph/4",
      "kind": "paragraph",
      "number": "4",
      "heading": "Building Regulations compliance statement",
      "url": "https://openlegislation.uk/building-higher-risk-buildings-procedures-wales-regulations-2025/schedule-1/paragraph-4",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/1"
    },
    {
      "path": "schedule/1/paragraph/5",
      "kind": "paragraph",
      "number": "5",
      "heading": "Fire and emergency file",
      "url": "https://openlegislation.uk/building-higher-risk-buildings-procedures-wales-regulations-2025/schedule-1/paragraph-5",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/1"
    },
    {
      "path": "schedule/1/paragraph/6",
      "kind": "paragraph",
      "number": "6",
      "heading": "Partial completion strategy",
      "url": "https://openlegislation.uk/building-higher-risk-buildings-procedures-wales-regulations-2025/schedule-1/paragraph-6",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/1"
    },
    {
      "path": "schedule/2",
      "kind": "schedule",
      "number": "2",
      "heading": "Exempt work",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "schedule/2/paragraph/1",
      "kind": "paragraph",
      "number": "1",
      "heading": null,
      "url": "https://openlegislation.uk/building-higher-risk-buildings-procedures-wales-regulations-2025/schedule-2/paragraph-1",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2"
    },
    {
      "path": "schedule/2/paragraph/2",
      "kind": "paragraph",
      "number": "2",
      "heading": null,
      "url": "https://openlegislation.uk/building-higher-risk-buildings-procedures-wales-regulations-2025/schedule-2/paragraph-2",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2"
    },
    {
      "path": "schedule/2/paragraph/3",
      "kind": "paragraph",
      "number": "3",
      "heading": null,
      "url": "https://openlegislation.uk/building-higher-risk-buildings-procedures-wales-regulations-2025/schedule-2/paragraph-3",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2"
    },
    {
      "path": "schedule/3",
      "kind": "schedule",
      "number": "3",
      "heading": "Transitional provisions",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "schedule/3/paragraph/1",
      "kind": "paragraph",
      "number": "1",
      "heading": "Transitional provisions in relation to plans deposited or initial notices given before 1 July 2026",
      "url": "https://openlegislation.uk/building-higher-risk-buildings-procedures-wales-regulations-2025/schedule-3/paragraph-1",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/3"
    },
    {
      "path": "schedule/3/paragraph/2",
      "kind": "paragraph",
      "number": "2",
      "heading": "Interpretation",
      "url": "https://openlegislation.uk/building-higher-risk-buildings-procedures-wales-regulations-2025/schedule-3/paragraph-2",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/3"
    },
    {
      "path": "note",
      "kind": "note",
      "number": null,
      "heading": "Explanatory note",
      "url": "https://openlegislation.uk/building-higher-risk-buildings-procedures-wales-regulations-2025/note",
      "extent": "E+W",
      "status": null,
      "parent": null
    }
  ],
  "has_text": true,
  "pdfs": [
    {
      "title": "Printed copy",
      "main": true,
      "language": "Mixed",
      "date": "2026-01-05",
      "size": 1380090,
      "url": "https://openlegislation.uk/building-higher-risk-buildings-procedures-wales-regulations-2025/pdf/wsi_20251321_mi.pdf",
      "source_url": "https://www.legislation.gov.uk/wsi/2025/1321/pdfs/wsi_20251321_mi.pdf"
    }
  ],
  "outstanding_effects": [],
  "made_under": [
    {
      "id": "ukpga/1984/55",
      "title": "Building Act 1984",
      "url": "https://openlegislation.uk/building-act-1984",
      "provisions": [
        "section/1",
        "section/3",
        "section/30A",
        "section/34",
        "section/35",
        "section/35B",
        "section/35C",
        "section/47",
        "section/91B",
        "schedule/1/paragraph/1A",
        "schedule/1/paragraph/1I",
        "schedule/1/paragraph/5B",
        "schedule/1/paragraph/5C",
        "schedule/1/paragraph/10"
      ]
    }
  ],
  "changes_made_to": 88,
  "changes_made_to_url": "https://openlegislation.uk/building-higher-risk-buildings-procedures-wales-regulations-2025/changes.json",
  "changes_made_by": 74,
  "changes_made_by_url": "https://openlegislation.uk/building-higher-risk-buildings-procedures-wales-regulations-2025/changes/by-it.json",
  "instruments_made_under": 0,
  "instruments_made_under_url": "https://openlegislation.uk/building-higher-risk-buildings-procedures-wales-regulations-2025/instruments.json",
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/wsi/2025/1321",
    "retrieved_at": "2026-10-28T22:56:17.663493+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}