# The Building (Procedure) (Scotland) Amendment Regulations 1988

S.I. 1988/2194 · made 10 December 1988

These Regulations replace and simplify the scale of building control fees in the Building (Procedure) (Scotland) Regulations 1981. The average increase is 20%. Flat rate and minimum fees are increased to £12.

Made under: 1959 c. 24 (Section 20, Section 29)

PDFs: Printed copy https://openlegislation.uk/building-procedure-scotland-amendment-regulations-1988/pdf/uksi_19882194_en.pdf

## Introductory text

BUILDING AND BUILDINGS
Made 10th December 1988
Laid before Parliament 29th December 1988
Coming into force 30th January 1989
The Secretary of State, in exercise of the powers conferred on him by sections 20 and 29(1) of the Building (Scotland) Act 1959 , and of all other powers enabling him in that behalf, hereby makes the following Regulations:

## 1 

These Regulations may be cited as the Building (Procedure) (Scotland) Amendment Regulations 1988 and shall come into force on 30th January 1989.

## 2 

For Schedule 2 to the Building (Procedure) (Scotland) Regulations 1981 there shall be substituted the Schedule to these Regulations.

## Signature

James Douglas-Hamilton
Parliamentary Under Secretary of State, Scottish Office
St Andrew’s House,
Edinburgh
10th December 1988

## SCHEDULE SUBSTITUTED FOR SCHEDULE 2

“SCHEDULE 2
TABLE OF FEES
Regulation 7
£
1 Application for warrant (including issue of warrant) for —
(a) erection, alteration or extension of a building (whether or not combined with application for warrant for change of use) —
(i) where the estimated cost of the operations does not exceed £1,000
12
(ii) where the estimated cost of the operations exceeds £1,000 but does not exceed £10,000 —
(a) the sum of
12
plus (b) for every £500 or part thereof exceeding £1,000
5
(iii) where the estimated cost of the operations exceeds £10,000 but does not exceed £20,000 —
(a) the sum of
100
plus (b) for every £1,000 or part thereof exceeding £10,000
6
(iv) where the estimated cost of the operations exceeds £20,000 but does not exceed £100,000 —
(a) the sum of
160
plus (b) for every £5,000 or part thereof exceeding £20,000
12
(v) where the estimated cost of the operations exceeds £100,000 but does not exceed £500,000 —
(a) the sum of
350
plus (b) for every £50,000 or part thereof exceeding £100,000
90
(vi) where the estimated cost of the operations exceeds £500,000 but does not exceed £1,000,00 —
(a) the sum of
1,070
plus (b) for every £100,000 or part thereof exceeding £500,000
120
(vii) where the estimated cost of the operations exceeds £1,000,000 —
(a) the sum of
1,670
plus (b) for every £200,000 or part thereof exceeding £1,000,000
180
(b) change of use only
12
(c) demolition of a building
12
2 Application for amendment of warrant —
(a) for additional operations where the estimated cost of these falls within any of the sub-paragraphs detailed in paragraph 1(a) of this Schedule—fee in accordance with appropriate sub-paragraph of paragraph 1(a) hereof
(b) where no additional operations are involved
12
3 Application for extension of a period of a warrant for a building intended to have a limited life
12
”

## Explanatory note

(This note is not part of the Regulations)
These Regulations replace and simplify the scale of building control fees in the Building (Procedure) (Scotland) Regulations 1981. The average increase is 20%. Flat rate and minimum fees are increased to £12.

---
Source: https://www.legislation.gov.uk/uksi/1988/2194 (the official version)
Page: https://openlegislation.uk/building-procedure-scotland-amendment-regulations-1988
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.