# The Building Regulations 2010, Regulation 44G: Application of paragraph S4 of Schedule 1 (erection of new buildings which are not residential buildings or mixed-use buildings)


(1) The requirements of paragraph S4 of Schedule 1 apply to the erection of a new building which is not a residential building or a mixed-use building (“new building”) as follows.
(2) If such a new building has, or will have, within its site boundary, more than 10 parking spaces—
(a) if there are or will be any parking spaces situated in a position other than in a covered car park—
(i) the requirements of paragraph S4 of Schedule 1 must first be applied in relation to those parking spaces; then
(ii) if the number of parking spaces which are situated in a position other than in a covered car park is insufficient to completely fulfil the requirements of paragraph S4 of Schedule 1, cable routes for electric vehicle charge points must be installed in a sufficient number of parking spaces in the covered car park in order to ensure compliance with the requirements of paragraph S4(b) of Schedule 1;
(b) if all the parking spaces are situated in a covered car park, cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of those parking spaces.

---
Source: https://www.legislation.gov.uk/uksi/2010/2214/regulation/44G (the official version)
Page: https://openlegislation.uk/building-regulations-2010/regulation-44G
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

