# Building Regulations (Northern Ireland) 2000, Regulation N7: Deemed-to-satisfy provisions for regulations N3, N4 and N5

Extent: N.I.
Status: prospective

(1) The requirements of regulation N3 shall be deemed to be satisfied, in the case of a building specified in column (2) of Table N opposite the reference to that regulation, if the sanitary pipework used in the building complies with the relevant provisions of the publications specified opposite thereto in column (3), as amended by the publications specified opposite thereto in column (4).
(2) The requirements of regulation N4 shall be deemed to be satisfied, in the case of a building specified in column (2) of Table N opposite the reference to that regulation, if the underground foul drainage for the building complies with the relevant provisions of the publications specified opposite thereto in column (3), as amended by the publications specified opposite thereto in column (4).
(3) The requirements of regulation N5 shall be deemed to be satisfied, in the case of a building specified in column (2) of Table N opposite the reference to that regulation, if the rain-water drainage for the building complies with the relevant provisions of the publications specified opposite thereto in column (3), as amended by the publications specified opposite thereto in column (4).

---
Source: https://www.legislation.gov.uk/nisr/2000/389/regulation/N7 (the official version)
Page: https://openlegislation.uk/building-regulations-northern-ireland-2000/regulation-N7
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.