# The Building Safety (Registration of Higher-Risk Buildings and Review of Decisions) (England) Regulations 2023, Regulation 17: Building control: for a building completed before start date

Extent: E+W

(1) In relation to a building which was completed before the start date—
(a) the date of the building certificate for the completed building,
(b) the reference number of the certificate, and
(c) the name of the building control body who gave the certificate.
(2) Where the PAP does not hold any of the information in a paragraph (1) they must provide an explanation to the regulator setting out the steps that the PAP has taken to obtain the information.

---