Paragraph 5 General Changes not yet applied. Later legislation changes this provision in ways not yet written into the text below: Sch.5, para.1 A added by Building Standards and Procedure Amendment 1999 regs.2(19),4 Sch 5, paras 1, 1A replaced (4.3.2002) by Building Standards 2001 regs 2(1), (11), 3 Sch. 5 para. 1(c) words inserted by Building Standards 1996 reg. 2(6)(a) Sch. 5 para. 3(c) revoked by Building Standards 1996 reg. 2(6)(b) Sch. 5 para. 3A inserted by Building Standards 1996 reg. 2(6)(c) Sch. 5 para. 4 words inserted by Building Standards 1996 reg. 2(6)(d) Except where the context otherwise requires, measurements shall be horizontal or vertical. ← Paragraph 4 Paragraph 5 Paragraph 6 →