# The Byers Gill Solar Order 2025, Part 2: Public rights of way to be permanently stopped up

Extent: E+W

(1)
Area
(2)
Public right of way to be stopped up
(3)
Extent of stopping up
(4)
Extent of replacement
Parish of BraffertonFootpath No.8The public right of way, referenced FP-Bfn.8, comprising a length of 205m, between points 3 and 4 on sheets 1 and 3 of the street works, public rights of way and access plans.To be re-provided along Footpath No.7, referenced FP-Bfn.7, from its intersection with Footpath No.9, referenced FP-Bfn.9, and a new footpath comprising a length of 150m between points marked 1 and 3 on sheet 1 of the street works, public rights of way and access plans.
Parish of BraffertonFootpath No.10The public right of way, referenced FP-Bfn.10, comprising a length of 460m as shown between points 15 and 18 on sheet 4 of the street works, public rights of way and access plans.To be re-provided along Footpath No.10, referenced FP-Bfn.10 from point 18 and along Bridleway No. 11, referenced BR-Bfn.11, and Footpath No. 15, referenced FP-Bfn.15 to point 16 with a new length of footpath comprising a length of 235m as shown between points marked 15 and 16 on sheet 4 of the street works, public rights of way and access plans.
Parish of Little StaintonFootpath No.1The public right of way, referenced FP-LtStn.1, comprising a length of 185m between points 34 and 36 as shown on sheet 6 of the street works, public rights of way and access plans.To be re-provided with a new length of footpath comprising a length of 200m as shown between points 34 and 36 on sheet 6 of the street works, public rights of way and access plans.
Parish of Great StaintonFootpath No.8The public right of way, referenced FP-GtStn.8, comprising its total length as shown between points 40 and 41 on sheets 8 and 7 of the street works, public rights of way and access plans.To be re-provided with a new section of footpath comprising a length of 870m as shown between points 39 and 40 on sheets 7 and 8 of the street works, public rights of way and access plans.
Parish of Great StaintonFootpath No.3The public right of way, referenced FP-GTStn.3, comprising a length of 290m between points 42 and 43 on sheet 8 of the street works, public rights of way and access plans.To be re-provided with a new section of footpath comprising a length of 375m as shown between points 42 and 43 on sheet 8 of the street works, public rights of way and access plans.
Parish of BishoptonFootpath No.2The public right of way, referenced FP-Btn.2, comprising a length of 490m as shown between points 45 and 46 on sheet 9 of the street works, public rights of way and access plans.To be re-provided with a new section of footpath comprising a length of 960m, as shown between points 45 and 46 on sheet 9 of the street works, public rights of way and access plans.
Parish of BishoptonFootpath No.4The public right of way, referenced FP-Btn.4, comprising a length of 415m as shown between points 49 and 50 on sheets 10 and 11 of the street works, public rights of way and access plans.To be re-provided with a new section of footpath comprising a length of 610m, as shown between points 49 and 50 on sheets 10 and 11 of the street works, public rights of way and access plans.

---
Source: https://www.legislation.gov.uk/uksi/2025/934/schedule/5/part/2 (the official version)
Page: https://openlegislation.uk/byers-gill-solar-order-2025/schedule-5/part-2/enacted
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.