# The Caledonian Maritime Assets (East Loch Tarbert) Harbour Revision Order 2019, Article 3: Power to construct works


(1) CMAL may in the lines and situations and upon the lands delineated on sheet 4 for each work, and within the limits of deviation shown on them and according to the levels shown on the deposited sections or elevations for each work, construct and maintain in East Loch Tarbert the following works, with all necessary works and conveniences connected with them—
Work No. 1 – A pier of open piled construction the location of which is shown on sheet 4 and the section of which is shown on sheet 5.
Work No. 2 – The reclamation and infilling of an area comprising 5,200 square metres of the seabed at East Loch Tarbert and the levelling of that area together with the levelling of the adjoining land to form marshalling, parking and storage areas having rock armoured revetted slopes on the seaward side, the location of which is shown on sheet 4 and a section of which is shown on sheet 5.
Work No. 3 – A single storey terminal building comprising passenger, baggage handling, ticketing and check-in facilities, sales areas, management offices, staff welfare facilities and storage areas the location of which is shown on sheet 4 and the plans and elevations of which are shown on sheet 6.
Work No. 4 – A roundabout forming a junction with the A868 to provide an entrance and exit for vehicular traffic, the location of which is shown on sheet 4.
(2) CMAL may, for the purposes of the works authorised by paragraph (1), demolish and remove the whole or part of any structures or apparatus lying within the limits of deviation and enclose and reclaim so much of the bed of the harbour and of the foreshore as lies within the limits of deviation and may hold and use the same as part of the harbour.
(3) Without affecting the general power conferred under paragraph (2), CMAL may in connection with the construction of the works on any land owned by it, demolish and remove so much of—
(a) the existing Ferry Terminal Building, the location of which is indicated on sheet 4, and
(b) the existing pier, the location of which is indicated on sheet 4,
as may be required.

---
Source: https://www.legislation.gov.uk/ssi/2019/296/article/3 (the official version)